A data centre in Australia can answer to the PSPF, the ISM, SOCI and its customers' audits at once, and to the HCF if it hosts government data. One layered design, documented once and mapped to each regime, gives every assessor the same record. Each regime still tests it its own way, and the HCF also looks at who owns and controls the facility. We assess the facility, design the boundaries and prepare the evidence.
Current as of October 2026:PSPF Release 2026, ISM September 2026
- Site perimeter
- BuildingISM layer 1ISM-0810
- Data hallISM layer 2ISM-1053
- Cage
- RackISM layer 3ISM-1530
Second route, from the site gate
Power · Cooling · Fuel · Meet-me room · Risers · Security control room
- Route from outside to the rack
- Detection at each door
- ISM layer
- Other boundary
Illustrative plan, not a site design.
- PSPF s 23.2deter, detect, delay, respond, recover
- CIRMP s 11(1)(e)test that you can detect, delay, deter, respond to and recover from a breach
Which rules apply
The rules an Australian data centre can answer to.
The PSPF binds Commonwealth entities, and its Requirements 0084 and 0085 apply the ISM to them on a risk-based approach. Both reach a commercial operator through its government customers.
Find the row that describes your facility. A facility can sit in more than one row, so read every row that fits.
| Your situation | PSPF | ISM | HCF | SOCI CIRMP | ISO 27001 / SOC 2 / PCI DSS |
|---|---|---|---|---|---|
| Commonwealth entity, own facility | Binds you | Binds you | Does not apply | Does not apply | Does not apply |
| Commonwealth entity using a commercial facility | Binds you | Binds you | Use a certified provider1 | Does not apply | Does not apply |
| Operator hosting classified information or systems of government significance | Through your government customer | Through IRAP or contract2 | Through your government customer3 | Does not apply | Through your customers' audits |
| Operator whose asset is a critical data storage or processing asset (s 12F) | Reference model | Reference model | Does not apply | Binds you4 | Through your customers' audits |
| Operator holding an HCF Strategic certificate | Through your government customer | Through IRAP or contract | Binds you | Replaced by the s 30AQ report5 | Through your customers' audits |
| A critical infrastructure entity's own data centre holding business critical data | Reference model | Reference model | Does not apply | Binds you6 | Does not apply |
| Operator with private customers only | Reference model | Reference model | Does not apply | Does not apply7 | Through your customers' audits |
Commonwealth entity, own facility
- PSPF: Binds you
- ISM: Binds you
Does not apply: HCF, SOCI CIRMP, ISO 27001 / SOC 2 / PCI DSS
Commonwealth entity using a commercial facility
- PSPF: Binds you
- ISM: Binds you
- HCF: Use a certified provider1
Does not apply: SOCI CIRMP, ISO 27001 / SOC 2 / PCI DSS
Operator hosting classified information or systems of government significance
- PSPF: Through your government customer
- ISM: Through IRAP or contract2
- HCF: Through your government customer3
- ISO 27001 / SOC 2 / PCI DSS: Through your customers' audits
Does not apply: SOCI CIRMP
Operator whose asset is a critical data storage or processing asset (s 12F)
- PSPF: Reference model
- ISM: Reference model
- SOCI CIRMP: Binds you4
- ISO 27001 / SOC 2 / PCI DSS: Through your customers' audits
Does not apply: HCF
Operator holding an HCF Strategic certificate
- PSPF: Through your government customer
- ISM: Through IRAP or contract
- HCF: Binds you
- SOCI CIRMP: Replaced by the s 30AQ report5
- ISO 27001 / SOC 2 / PCI DSS: Through your customers' audits
A critical infrastructure entity's own data centre holding business critical data
- PSPF: Reference model
- ISM: Reference model
- SOCI CIRMP: Binds you6
Does not apply: HCF, ISO 27001 / SOC 2 / PCI DSS
Operator with private customers only
- PSPF: Reference model
- ISM: Reference model
- ISO 27001 / SOC 2 / PCI DSS: Through your customers' audits
Does not apply: HCF, SOCI CIRMP7
- Binds you
- Reaches you through someone else
- Reference model
- Does not apply
Reference model: it does not bind you, but it gives you a public, documented model to design and test against.
- 1
PSPF Release 2026 Req 0111 has security classified information and systems of government significance hosted on a cloud or data centre service certified under the HCF or HCF 2. Req 0112 has non-corporate Commonwealth entities buy data centre space through the Data Centre Facilities Supplies Panel.
- 2
PSPF Req 0109 expects cloud providers to hold an IRAP assessment against the latest ISM from the previous 24 months. The ISM is not legally binding unless legislation or a direction requires it. The ISMIRAP
- 3
Home Affairs paused HCF registration for new providers on 3 November 2025. The PSPF says providers will be able to certify under HCF 2 from late 2026 or early 2027. The Hosting Certification Framework explained
- 4
The enhanced CIRMP rules (LIN 26/075, in force from 10 June 2026) list nine classes in s 4A(1), and critical data storage or processing assets are not one of them. An asset declared under s 51 after 10 June 2026 could still be brought in. The SOCI Act explainedSOCI readiness advisory
- 5
Under SOCI s 30AB(4), the CIRMP Part does not apply to an asset used to provide services covered by an HCF Strategic certificate the responsible entity holds; s 30AQ asks instead for an annual report within 90 days of the end of the financial year, approved by the board where there is one. The carve-out is for Strategic certificates only.
- 6
The CIRMP Rules take a critical infrastructure entity's own data storage system that meets SOCI s 9(7) to be part of that entity's asset, so the asset's own program covers it.
- 7
Private customers can still bring SOCI in. Under s 12F(2), if a customer is the responsible entity for a critical infrastructure asset and you know your asset is used wholly or primarily for a service relating to its business critical data, your asset is a critical data storage or processing asset.
When teams bring us in
Data centre teams usually call us in one of five situations.
Each one starts with a request from a customer, an auditor or a deadline. Here is what we do about each.
A government customer asks about Release 2026
Our government customer wants to know how we support PSPF Requirements 0111 and 0112.”
PSPF Release 2026 changed both requirements on 1 July 2026. Req 0111 covers where classified information and systems of government significance are hosted, and Req 0112 covers how non-corporate Commonwealth entities buy data centre space.
What we do
We map your facility and its evidence to what each requirement asks of your customer, so their security team gets a straight answer and you know where your evidence stands.
The HCF explainedA customer says your service holds business critical data
A customer has told us our service relates to their business critical data.”
Under SOCI s 12F(3), a responsible entity tells its data storage or processing provider when the service relates to business critical data. Whether that captures your asset turns on whether it is used wholly or primarily for that service.
What we do
We work through the test with you and your lawyers against how the facility is actually used. If the asset is captured, we build the physical security part of your CIRMP and the evidence behind it.
SOCI physical security for data centresGetting ready for HCF 2
HCF registration is paused and we want to be ready when HCF 2 opens.”
Home Affairs paused registration for new providers on 3 November 2025 while it reforms the framework. The PSPF says providers will be able to certify under HCF 2 from late 2026 or early 2027.
What we do
We assess physical access security, one of the core capabilities the current HCF ties to ownership and control, and keep the evidence current so the application is not where the work starts.
The HCF explainedA tenant's auditor asks about your access list
Our tenant's SOC 2 auditor wants evidence that they review who can enter our facility.”
SOC 2 CC6.4 restricts physical access to facilities such as data centres, and its points of focus cover creating, modifying, removing and reviewing that access. The tenant owns the review. The access list lives in your systems.
What we do
We set up a review your tenants can run and evidence: who holds access to their space, the tenant's sign-off, and every change recorded in your access control system.
A zone is due for certification again
One of our security zones is due for certification again.”
PSPF s 24.2.3 makes certification time-limited: recertification follows expiry, a change in business impact level, significant changes to the architecture or controls, or conditions the Accreditation Authority sets. Table 40 also expects electronic access control to run current patches with no obsolete components.
What we do
We check the zone against its certified state, find what has drifted, and prepare the evidence for the Certification Authority the PSPF names.
PSPF security zones explained
Every request lands on the same facility.
We document it once and map the record to each regime that asks.
One layered design
The PSPF and the SOCI rules use the same five verbs, so one layered design answers both.
The PSPF tells you to build all five layers of physical security (s 23.2). CIRMP s 11(1)(e) makes you prove all five by test.
Respond and recover are organisational capabilities, not properties of a fence or a rack.
What CIRMP section 11 requires of a data centreBuilt into the facility
- Deter
- Visible boundaries and controls at the site, the building and the hall.
- Detect
- Alarms, access logs and monitoring at every door.
- Delay
- Walls, doors, cages and containers that hold until someone arrives.
Run by your organisation
- Respond
- Someone who answers the alarm, with an agreed escalation path.
- Recover
- Restoring service and the controls themselves after a breach.
What we assess
What we assess, and which standard asks for it.
We walk the facility from the site perimeter to the plant room. Each area is checked once and mapped to the clauses that ask for it, so one walk answers every regime.
| Area and what we check | PSPF / ISM | CIRMP s 11 | ISO 27001 A.7 | SOC 2 |
|---|---|---|---|---|
| Site and perimeterWhere the site sits, its standoff, site access and parking, and the perimeter line. | PSPF Req 0191, Table 36 | s 11(1)(b) | A.7.1 | CC6.4 |
| Entry, visitors and critical workersWho may enter, how visitors are escorted, and who counts as a critical worker. | PSPF Table 38 | s 11(1)(d) | A.7.2 | CC6.4 |
| Data halls and zonesWhich Security Zone each hall needs, set by the aggregated classification it holds, and the containers that go with it. | PSPF Req 0094, Table 22 · ISM-0810, ISM-1053 | s 11(1)(a) | A.7.3, A.7.6 | CC6.4 |
| Cage, rack and containersCage and rack locks, and the container class the zone and the classification call for. | PSPF Table 22 · ISM-1530, ISM-0813 | s 11(1)(d) | A.7.8 | CC6.4 |
| Keys and credentialsHow keys, cards and codes are issued, changed, removed and reviewed. | ISM-1074 | s 11(1)(d) | A.7.2 | CC6.4 |
| Monitoring and alarmsAlarm class and who certifies it, monitoring coverage, and that no unauthorised person can observe systems or screens. | PSPF s 25.6, Table 40 · ISM-0164 | s 11(1)(c), (1)(e) | A.7.4 | CC6.4 |
| Plant and pathwaysPower, cooling, fuel, the meet-me room, risers and cabling: the plant the HCF treats as core infrastructure. | ISM-0813, ISM-1296 | s 11(1)(a), (1)(b) | A.7.11, A.7.12 | A1.2 |
| Natural hazards and environmentFire, flood, heatwave and the other natural hazards the site faces, and the protections against each. | PSPF Table 36 | s 11(1)(b) | A.7.5 | A1.2 |
| Equipment and media lifecycleEquipment and media secured when not in use, maintenance access, and disposal that leaves nothing recoverable. | ISM-0161 | No matching clause | A.7.10, A.7.13, A.7.14 | CC6.5 |
| Response and testingWho answers an alarm, and a test that the arrangements can detect, delay, deter, respond and recover. | PSPF s 23.2 | s 11(1)(c), (1)(e) | No matching clause | No matching clause |
| Security systems maintenanceAccess control on current patches with no obsolete components, and alarms serviced by an authorised provider. | PSPF Table 40, s 25.6 | No matching clause | A.7.13 | No matching clause |
Site and perimeterWhere the site sits, its standoff, site access and parking, and the perimeter line.
- PSPF / ISM
- PSPF Req 0191, Table 36
- CIRMP s 11
- s 11(1)(b)
- ISO 27001 A.7
- A.7.1
- SOC 2
- CC6.4
Entry, visitors and critical workersWho may enter, how visitors are escorted, and who counts as a critical worker.
- PSPF / ISM
- PSPF Table 38
- CIRMP s 11
- s 11(1)(d)
- ISO 27001 A.7
- A.7.2
- SOC 2
- CC6.4
Data halls and zonesWhich Security Zone each hall needs, set by the aggregated classification it holds, and the containers that go with it.
- PSPF / ISM
- PSPF Req 0094, Table 22 · ISM-0810, ISM-1053
- CIRMP s 11
- s 11(1)(a)
- ISO 27001 A.7
- A.7.3, A.7.6
- SOC 2
- CC6.4
Cage, rack and containersCage and rack locks, and the container class the zone and the classification call for.
- PSPF / ISM
- PSPF Table 22 · ISM-1530, ISM-0813
- CIRMP s 11
- s 11(1)(d)
- ISO 27001 A.7
- A.7.8
- SOC 2
- CC6.4
Keys and credentialsHow keys, cards and codes are issued, changed, removed and reviewed.
- PSPF / ISM
- ISM-1074
- CIRMP s 11
- s 11(1)(d)
- ISO 27001 A.7
- A.7.2
- SOC 2
- CC6.4
Monitoring and alarmsAlarm class and who certifies it, monitoring coverage, and that no unauthorised person can observe systems or screens.
- PSPF / ISM
- PSPF s 25.6, Table 40 · ISM-0164
- CIRMP s 11
- s 11(1)(c), (1)(e)
- ISO 27001 A.7
- A.7.4
- SOC 2
- CC6.4
Plant and pathwaysPower, cooling, fuel, the meet-me room, risers and cabling: the plant the HCF treats as core infrastructure.
- PSPF / ISM
- ISM-0813, ISM-1296
- CIRMP s 11
- s 11(1)(a), (1)(b)
- ISO 27001 A.7
- A.7.11, A.7.12
- SOC 2
- A1.2
Natural hazards and environmentFire, flood, heatwave and the other natural hazards the site faces, and the protections against each.
- PSPF / ISM
- PSPF Table 36
- CIRMP s 11
- s 11(1)(b)
- ISO 27001 A.7
- A.7.5
- SOC 2
- A1.2
Equipment and media lifecycleEquipment and media secured when not in use, maintenance access, and disposal that leaves nothing recoverable.
- PSPF / ISM
- ISM-0161
- CIRMP s 11
- No matching clause
- ISO 27001 A.7
- A.7.10, A.7.13, A.7.14
- SOC 2
- CC6.5
Response and testingWho answers an alarm, and a test that the arrangements can detect, delay, deter, respond and recover.
- PSPF / ISM
- PSPF s 23.2
- CIRMP s 11
- s 11(1)(c), (1)(e)
- ISO 27001 A.7
- No matching clause
- SOC 2
- No matching clause
Security systems maintenanceAccess control on current patches with no obsolete components, and alarms serviced by an authorised provider.
- PSPF / ISM
- PSPF Table 40, s 25.6
- CIRMP s 11
- No matching clause
- ISO 27001 A.7
- A.7.13
- SOC 2
- No matching clause
For every check behind these areas, with the evidence to ask for and the reference in each standard, use our item-level data centre physical security audit checklist.
Standards in scope
Data centre security standards compared: what each one covers
Availability ratings and security standards are often quoted side by side. Here is what each one says it covers on security, in its current edition.
| Standard | Current edition | What it covers on security |
|---|---|---|
| TIA-942 | TIA-942-C, May 2024 | Physical security is one of its subsystems, alongside architecture, telecommunications, power, cooling, fire protection, safety and monitoring. Ratings run from Rated-1 to Rated-4. |
| EN 50600 and ISO/IEC 22237 | EN 50600-2-5:2021 · ISO/IEC 22237-6:2024 | These are the security parts of each series. ISO/IEC 22237-6 covers unauthorised access, intrusion, internal fire, and internal and external environmental events. |
| Uptime Institute Tiers | Tier Certification | Uptime says its topology and operational sustainability standards do not cover security. Tier Certification is an availability and resilience classification, though its evaluation does look at physical security. |
| ISO/IEC 27001 | ISO/IEC 27001:2022 (AS/NZS ISO/IEC 27001:2023 in Australia) | Annex A holds 14 physical controls, A.7.1 to A.7.14, from perimeters and physical entry to supporting utilities, cabling and secure disposal. ISO 27001 explained |
| SOC 2 | 2017 Trust Services Criteria | CC6.4 restricts physical access to facilities such as data centres to authorised personnel. Its points of focus cover creating, modifying, removing and reviewing access, and points of focus are not mandatory. SOC 2 explained |
| PCI DSS | PCI DSS v4.0.1 | Requirement 9 covers restricting physical access to cardholder data. PCI DSS explained |
- TIA-942
- TIA-942-C, May 2024
- Physical security is one of its subsystems, alongside architecture, telecommunications, power, cooling, fire protection, safety and monitoring. Ratings run from Rated-1 to Rated-4.
- EN 50600 and ISO/IEC 22237
- EN 50600-2-5:2021 · ISO/IEC 22237-6:2024
- These are the security parts of each series. ISO/IEC 22237-6 covers unauthorised access, intrusion, internal fire, and internal and external environmental events.
- Uptime Institute Tiers
- Tier Certification
- Uptime says its topology and operational sustainability standards do not cover security. Tier Certification is an availability and resilience classification, though its evaluation does look at physical security.
- ISO/IEC 27001
- ISO/IEC 27001:2022 (AS/NZS ISO/IEC 27001:2023 in Australia)
- Annex A holds 14 physical controls, A.7.1 to A.7.14, from perimeters and physical entry to supporting utilities, cabling and secure disposal. ISO 27001 explained
- SOC 2
- 2017 Trust Services Criteria
- CC6.4 restricts physical access to facilities such as data centres to authorised personnel. Its points of focus cover creating, modifying, removing and reviewing access, and points of focus are not mandatory. SOC 2 explained
- PCI DSS
- PCI DSS v4.0.1
- Requirement 9 covers restricting physical access to cardholder data. PCI DSS explained
How the work runs
We can start at any point in a facility's life, from the facility security plan to recertification.
Data centre work runs on the same four tracks as the rest of the practice. Each stage ends on a decision that stays yours: carry on with us, take it in-house, or stop where you are.
A gap assessment against the regimes that apply.
We confirm which regimes reach your facility, walk the five boundaries and the plant, and rank the gaps with the evidence behind each one.
Boundaries and zone layout, designed with the entity.
We design the boundaries and zone layout with the Commonwealth entity, as input to its facility security plan under Req 0190. Where construction must follow the ASIO Technical Notes, we design with the SCEC-endorsed consultant or adviser who works from them.
Access control, monitoring and alarm remediation.
We fix access control, monitoring and alarms alongside your facilities team and installers. For Type 1A alarm work, we scope in a SCEC-endorsed Security Zone consultant.
Recertification, annual reports and access reviews.
We watch for the changes that trigger recertification, prepare the evidence for the CIRMP annual report or the s 30AQ report, and run the access reviews your tenants' auditors ask for.
Certification and accreditation
Who certifies and who accredits.
PSPF Release 2026 keeps the two steps apart: certification confirms the controls, and accreditation accepts the residual risk before operational use (Req 0198).
| Facility, control or regime | Who certifies | Who accredits |
|---|---|---|
| PSPF Security Zones and their controls | ||
| Zones One to FourReq 0196, 0198 · Tables 40, 41 | The entity's Chief Security Officer, or a delegated security practitioner | Chief Security Officer or delegate |
| Zone Five holding TOP SECRET or aggregated information with a catastrophic business impactReq 0197, 0198 | ASIO-T4 | Chief Security Officer or delegate |
| Outsourced facility housing assets with a catastrophic business impactReq 0096 | ASIO-T4 | ASD |
| Sensitive Compartmented Information Facility (SCIF)Req 0199 | Accredited by ASD under the National SCIF Accreditation Program before operational use | |
| SCEC-approved Type 1A alarm, Zones Four and FiveTable 40 | A SCEC-endorsed Security Zone consultant | Counts towards the zone's accreditation |
| Commercial alarm (Zones One to Three) and electronic access control (all zones)Table 40 | A suitably qualified installer or designer | Counts towards the zone's accreditation |
| Other regimes: who signs off | ||
| HCF certification | Home Affairs, which administers the HCF. Registration has been paused since 3 November 2025. | |
| IRAP assessmentReq 0109 | An ASD-endorsed IRAP assessor, against the latest ISM; for cloud providers, within the previous 24 months | |
| SOCI CIRMP | No certifier. Your board, where you have one, approves the annual report | |
| ISO/IEC 27001:2022 | An accredited certification body | |
| SOC 2 | A CPA firm, which attests in a SOC 2 report | |
| PCI DSS v4.0.1 | A Qualified Security Assessor, or a self-assessment | |
| Uptime Tier | Uptime Institute, as an availability and resilience classification | |
| TIA-942 | Usually a certification body licensed by TIA, rather than TIA itself | |
PSPF Security Zones and their controls
- Zones One to FourReq 0196, 0198 · Tables 40, 41
- Who certifies
- The entity's Chief Security Officer, or a delegated security practitioner
- Who accredits
- Chief Security Officer or delegate
- Zone Five holding TOP SECRET or aggregated information with a catastrophic business impactReq 0197, 0198
- Who certifies
- ASIO-T4
- Who accredits
- Chief Security Officer or delegate
- Outsourced facility housing assets with a catastrophic business impactReq 0096
- Who certifies
- ASIO-T4
- Who accredits
- ASD
- Sensitive Compartmented Information Facility (SCIF)Req 0199
Accredited by ASD under the National SCIF Accreditation Program before operational use
- SCEC-approved Type 1A alarm, Zones Four and FiveTable 40
- Who certifies
- A SCEC-endorsed Security Zone consultant
- Who accredits
- Counts towards the zone's accreditation
- Commercial alarm (Zones One to Three) and electronic access control (all zones)Table 40
- Who certifies
- A suitably qualified installer or designer
- Who accredits
- Counts towards the zone's accreditation
Other regimes: who signs off
- HCF certification
Home Affairs, which administers the HCF. Registration has been paused since 3 November 2025.
- IRAP assessmentReq 0109
An ASD-endorsed IRAP assessor, against the latest ISM; for cloud providers, within the previous 24 months
- SOCI CIRMP
No certifier. Your board, where you have one, approves the annual report
- ISO/IEC 27001:2022
An accredited certification body
- SOC 2
A CPA firm, which attests in a SOC 2 report
- PCI DSS v4.0.1
A Qualified Security Assessor, or a self-assessment
- Uptime Tier
Uptime Institute, as an availability and resilience classification
- TIA-942
Usually a certification body licensed by TIA, rather than TIA itself
Certification stays with the authority each regime names, so the design and the certificate always come from different hands.
For Zone Five areas and SCIFs, we prepare the facility around them and the evidence your cleared staff present.
PSPF security zones explainedGuides
Guides to PSPF zones, the HCF, SOCI physical security and the audit.
Each guide takes one part of this page further, with the clauses quoted and the dates stated.
- Learn guide
What are PSPF security zones?
Zones One to Five in PSPF Release 2026, which zone PROTECTED information needs, and who certifies and accredits each.
Read the guide - Learn guide
What is the Hosting Certification Framework (HCF)?
Strategic, Assured and Uncertified, the registration pause since 3 November 2025, and what PSPF Req 0111 and 0112 ask.
Read the guide - Blog
SOCI physical security for data centres: what CIRMP section 11 requires, and when the enhanced rules apply
When s 12F captures a data centre, the duties in s 11, and the routes by which the June 2026 enhanced rules can reach one.
Read the post - Blog
Data centre physical security audit checklist, mapped to the PSPF, ISM, ISO 27001, SOC 2 and SOCI
Every check, grouped by the five boundaries and the plant, with the evidence to ask for. Printable, with no sign-up.
Read the post
FAQ
Common questions about data centre physical security
The questions operators and agency security teams bring to a first conversation.
- Does the PSPF apply to a commercial data centre?
- Not directly. The PSPF binds Commonwealth entities and reaches a commercial operator through them: PSPF Release 2026 Req 0111 has entities host security classified information and systems of government significance on a service certified under the HCF or HCF 2, and Req 0112 has non-corporate Commonwealth entities buy data centre space through the Data Centre Facilities Supplies Panel. Uncertified providers may host UNOFFICIAL and OFFICIAL data.
- Does the ISM apply to a private data centre?
- Not as law. The ISM is not legally binding unless legislation or a direction requires it, so it reaches a private operator through its customers: through an IRAP assessment against the latest ISM, which PSPF Req 0109 expects cloud providers to have had within the previous 24 months, or through a contract that names it. Its physical guidelines describe three layers: a security zone for the facility, a second zone for the server or communications room, and security containers.
- Which zone does PROTECTED information need?
- PSPF Release 2026 Table 22 permits PROTECTED technology assets in any of Zones Two to Five, with the container requirement falling as the zone rises: SCEC Class C in Zone Two, SCEC Class C recommended in Zone Three, and a lockable commercial cabinet in Zones Four and Five. Table 23 lets the container requirement drop further when the room is a separate Security Zone inside another. “Zone 4 = PROTECTED” is operator shorthand, not the PSPF's rule.
- Who certifies a data centre security zone?
- For Zones One to Four, the Commonwealth entity's Chief Security Officer or a delegated security practitioner certifies the zone (Req 0196). ASIO-T4 certifies Zone Five areas holding TOP SECRET or aggregated information with a catastrophic business impact (Req 0197). The Chief Security Officer or delegate then accredits Zones One to Five once the controls are certified and the residual risk is accepted (Req 0198). An outsourced facility housing assets with a catastrophic business impact is certified by ASIO-T4 and accredited by ASD before use (Req 0096).
- What does ASIO-T4 certified mean for a data centre?
- Under PSPF Release 2026, ASIO-T4 certifies two things: Zone Five areas holding TOP SECRET or aggregated information with a catastrophic business impact (Req 0197), and outsourced facilities that house assets with a catastrophic business impact, which ASD then accredits before use (Req 0096). Zones One to Four are certified by the entity's Chief Security Officer or a delegate.
- Do the June 2026 enhanced CIRMP rules apply to data centres?
- Not as a class. The enhanced rules (LIN 26/075, in force from 10 June 2026) list nine asset classes in s 4A(1), and critical data storage or processing assets are not one of them. They can still reach a data centre in two ways: an asset declared under s 51 after 10 June 2026, and a critical infrastructure entity's own data storage system that meets s 9(7), which is taken to be part of that entity's asset. The baseline physical security rule, s 11, applies to critical data storage or processing assets either way.
- Is an Uptime Tier or TIA-942 rating a security certification?
- Neither is a security certification. Uptime Institute says its topology and operational sustainability standards do not cover security, and Tier Certification is an availability and resilience classification, though its evaluation does look at physical security. TIA-942-C (May 2024) covers physical security as one of several subsystems, and its Rated-1 to Rated-4 levels describe protection against physical events. Security assurance comes from PSPF zone certification, ISO/IEC 27001:2022 certification or a SOC 2 report.
- When do you need a SCEC-endorsed consultant?
- When a Type 1/1A security alarm system is designed, acceptance tested or commissioned. SCEC says the PSPF does not require agencies to engage a SCEC Security Zone Consultant to design and build security zones, but one must be engaged for Type 1/1A alarm work, and PSPF Table 40 has a SCEC-endorsed consultant certify the Type 1A alarm in Zones Four and Five. We scope that consultant in when the work calls for one.
Talk to us about your facility's next assessment.
Tell us what the facility hosts, who its customers are, and which certificate, report or audit comes next. We scope the work in writing before anyone walks the site.