Risk Management

Gut feelings are not
a risk strategy

Your board asks "what's our risk exposure?" and the answer is a spreadsheet last updated in February. In Alvor every risk has a score, an owner, a treatment and a verdict against your appetite, and the record shows who accepted what was left, and until when.

123112421331121MinLowMedHighSev12345

A register nobody argues with, because they wrote it.

The CISO

Appetite that produces a verdict, not a conversation.

  • Per-category thresholds plus an organisation default
  • A live verdict on every risk: within appetite, exceeds appetite, tolerance breach
  • A Breaches tab listing what is over the line right now

The risk owner

Always know the next step, and whether it is yours.

  • A Next-up card on every risk naming the current step and who holds it
  • One permission-gated action, so you cannot be shown work you may not do
  • Due or overdue shown honestly, not rounded in your favour

The business owner

Accepting a risk is a decision with your name on it.

  • The requester nominates an acceptor typed Business Owner, System Owner or CISO
  • Only that person can decide, with conditions, scope and an expiry date
  • The residual score is snapshotted at the moment of acceptance

Every risk follows the same path.

Every risk follows the same structured path from identification through validated closure. No silent approvals, no gaps in the record.

01

Risk identified

A risk is submitted with title, description, category, and business context. Alvor assigns it to an assessor and the lifecycle begins. No risk sits unowned.

Risk recordAssessor assignmentInitial context

What that looks like on screen.

01 · The register

Every risk, with the step it is waiting on

Not a spreadsheet of scores. Each row carries its owner, its current lifecycle stage and whether it sits inside the appetite your organisation set, so the list tells you where to spend the next hour rather than just what exists.

app.alvor.io/risk/register
Every risk, with the step it is waiting on

02 · The dashboard

Where the register actually stands, today

Critical risks, how many sit above appetite, and whether any review is overdue. The heat map plots every risk on the likelihood and impact scales you defined, and the top risks are ranked by their score rather than by who shouted loudest.

app.alvor.io/risk
Where the register actually stands, today

03 · Appetite

The line you drew, and everything currently over it

Set a threshold per risk category and every risk gets a live verdict against it. The Breaches tab lists what has crossed the line, so appetite is something the register enforces rather than a paragraph in a policy nobody opens.

app.alvor.io/risk/appetite
The line you drew, and everything currently over it

Your risk portfolio
at a glance

A live dashboard that answers “where do we stand?” in seconds. The board gets numbers, not narratives.

  • 25-cell matrix with drill-down per cell
  • Filter by level, category, assignee, or treatment
  • Inherent vs. residual scoring for before-and-after clarity
  • Export the full register for board-level reporting

Total Risks

46

Critical

4

Mitigated

18

Overdue

3

1
2
1
1
3
3
1
1
2
4
2
2
3
1
1

Treatment breakdown

Mitigate (24)
Transfer (8)
Accept (10)
Avoid (4)

The library maps threats and suggests the controls

A built-in library powered by STRIDE and MITRE ATT&CK. Link threats to risks and Alvor recommends controls automatically - ranked by effectiveness.

  • STRIDE categories with kill chain phase mapping
  • MITRE ATT&CK tactic and technique identifiers
  • Auto-suggest controls ranked by effectiveness
  • Custom threat categories for your organization
S

Spoofing

Identity impersonation attacks targeting authentication systems

T

Tampering

Unauthorized modification of data at rest or in transit

R

Repudiation

Actions that cannot be traced back to a specific actor

I

Info Disclosure

Exposure of sensitive data to unauthorized parties

D

Denial of Service

Attacks that degrade or destroy system availability

E

Elevation

Privilege escalation from standard to administrative access

A register that says what happens next.

Most risk registers record that a risk exists. The work is deciding what to do about it, and that is the part that usually lives outside the tool.

Instead of

A risk register in a spreadsheet

Free and familiar, with no ownership, no workflow and no trustworthy history.

In Alvor

Named owners, a lifecycle, a hash-chained history, and records that reference the assets and findings behind them.

Instead of

A scoring scale someone else chose

Likelihood and impact definitions you inherited and quietly disagree with.

In Alvor

Your own likelihood labels, five impact dimensions and a 5x5 narrative matrix, edited once and carried into the export's Criteria sheet.

Instead of

Risk acceptance by email

Somebody said yes once, in a thread, and nobody can find it at audit.

In Alvor

A typed acceptor, recorded conditions, a scope, an expiry date and the residual score snapshotted at the decision.

These are the exact links in the data model.

Named precisely, because “everything connects to everything” is not a claim anyone can check. Select any module to see its links.

01Set the program
02Design new systems
03Prove controls work
04Manage risk, vendors and continuity
RegisterThe register the rest stands on
Runs onYour own instance
Dedicated cloudOne instance for your company, in your region
On-premiseThe same platform, on your own servers
Air-gappedFully disconnected, with a self-hosted model

Links the product makes today

Risk Management links to

ComplianceClosing a risk marks the compliance findings linked to it as compliant, with audit entries. Controls link from the control's Risks tab.
Secure by DesignA design sign-off approved with conditions creates a risk automatically, in the same transaction.
Asset ManagementA risk lists the assets it affects, many to many, chosen by live asset search at intake.
Business ContinuityAn exercise or debrief finding is escalated into the risk register by someone holding risk write access.

Further reading

Perspectives on risk from the Alvor team.

Risk Management

Stop tracking risks in spreadsheets. Start making risk-informed decisions.

Alvor quantifies, visualises, and tracks every risk across your environment - automatically connected to the assets it affects, the controls that mitigate it, and the frameworks it impacts.