What is third-party risk management (TPRM)?

Third-party risk management (TPRM) is how an organisation identifies, assesses, contracts for and monitors the risks of relying on outside parties: vendors, suppliers, service providers and the subcontractors behind them. It covers the whole relationship, from the decision to engage to exit. Outsourcing a service does not outsource the responsibility, so each relationship needs a tier, evidence, contract terms and a named decision on the risk that remains.

Salman Khan, Founder & Principal, AlvorUpdated 7 October 202621 min read

On this page

  1. Why third-party risk management matters
  2. How third-party risk management works, step by step
  3. A worked example: a logistics company hands its IT operations to a managed service provider
  4. Common mistakes
  5. Third-party risk management compared with its neighbours
  6. Standards and references
  7. How Alvor helps

In one minute

  • A third party is anyone you rely on, with or without a contract. The US banking agencies' definition covers consultants, affiliates and joint ventures as well as vendors, and your providers' own providers are your fourth parties.
  • Outsourcing moves the work. The accountability stays with you, and the US agencies, the EU's DORA and Australia's privacy regulator each say so in their own words.
  • The US banking agencies publish a five-stage lifecycle: planning, due diligence and selection, contract negotiation, ongoing monitoring, and termination. Vendor guides list four to nine; the work is the same.
  • Depth follows the tier, and the tier follows four questions: what data the party holds, what access it has into your systems, what stops if it fails, and how hard it would be to replace.
  • A SOC 2 report becomes evidence once you have read its scope, its period, its exceptions, the controls it expects you to run, and the subservice organisations it carved out.
  • Third parties were involved in 48% of the breaches in Verizon's 2026 Data Breach Investigations Report, up from 30% a year earlier.

Third-party risk management is the work of knowing who you depend on outside your own organisation, what each of them can reach, and what you decided about the risk each one brings. Its rulebook changed three times in the last ten months. The Basel Committee on Banking Supervision published final principles for third-party risk on 10 December 2025. APRA's re-made CPS 230 commenced in Australia on 1 July 2026. On 18 September 2026 the European Banking Authority published final guidelines on the management of third-party risk, replacing its 2019 outsourcing guidelines. Alongside them, NIST released a due diligence quick-start guide in July 2026, and ASD's September 2026 Information security manual added two controls on how a service provider may reach into your systems.

The term has many synonyms because every document uses its own word: supplier for NIST and ISO, third-party relationship for the US banking agencies, ICT third-party service provider for the EU's Digital Operational Resilience Act (DORA), service provider for CPS 230, processor for the GDPR. Vendor risk management usually means the narrower set of parties you buy from. This guide says third party and means the wide set: the US agencies define a third-party relationship as "any business arrangement between a banking organization and another entity, by contract or otherwise".

Why third-party risk management matters

Third parties now sit inside nearly half of all breaches. Verizon's 2026 Data Breach Investigations Report (DBIR), covering incidents from 1 November 2024 to 31 October 2025, found third-party involvement in 48% of the breaches it analysed, up from 30% the year before: in Verizon's words, "a 60% increase, after already doubling the year before". It counts three ways a third party can be involved.

  • You and your data
  • The third party
  • The attack path

Kind 1

A flaw in their product, running in your environment

Attacker

The vendor's product, which you run
Your data

Your environment

The data was in your custody. The way in existed because of a flaw in a vendor's product or a compromised vendor build.

Kind 2

They hold your data

Attacker

Your data, held by them

The vendor's environment

Not on the path

Your environment

The vendor hosts your data in its own environment, and the attack lands on the vendor. Your network is never touched.

Kind 3

They have a connection into you

Attacker

Their connection into your network

The vendor's environment

Your data

Your environment

The attacker gets into the vendor first, then uses the vendor's own connection to move into your environment.

Breaches with a third party involved

2026 report

48%

2025 report

30%

Verizon calls it a 60% increase, after already doubling the year before. All three kinds count, so the figure is broader than a supplier being breached.

Three ways a third party is involved in a breach, as Verizon's 2026 DBIR counts them

The first kind includes an exploited flaw in a product you run yourself, so the 48% is broader than "a supplier was breached". The third kind does the most damage per relationship, because the attacker arrives with access you granted on purpose. The worked example below deals with it.

Not every third-party failure has an attacker in it. On 19 July 2024 a faulty CrowdStrike update took Windows machines down around the world, and Microsoft estimated it "affected 8.5 million Windows devices, or less than one percent of all Windows machines". One provider and one update produced a worldwide outage. That is concentration risk, and no questionnaire answer would have predicted it.

The risk also reaches past the party you contracted. The CL0P ransomware group began exploiting CVE-2023-34362, an SQL injection flaw in Progress Software's MOVEit Transfer, on 27 May 2023, according to CISA and FBI advisory AA23-158A. On 6 June 2023 Zellis, a UK payroll provider that used MOVEit, confirmed that some of its customers had been affected; British Airways, the BBC, Boots and Aer Lingus were among them. For British Airways, Zellis was the third party and MOVEit the fourth.

Every regime that touches the subject agrees that the organisation relying on the third party keeps the responsibility.

  • What the rule says
  • Where the responsibility sits

US banking agencies

Interagency guidance, June 2023

"The use of third parties does not diminish or remove banking organizations' responsibilities." A bank meets its legal duties as if the work were done in-house.

DORA, Article 28(1)

EU regulation, applies from 17 January 2025

Financial entities remain "fully responsible for compliance with, and the discharge of, all obligations under this Regulation", and manage ICT third-party risk as part of ICT risk.

OAIC

Notifiable Data Breaches guidance, February 2025

Information a provider holds for you is held jointly. An eligible data breach at one entity is an eligible data breach of every entity that holds the information.

Your organisation

The work moves to the provider. The responsibility does not.

To customers, regulators and auditors, the organisation that chose the provider answers for what the provider does with its data and its systems.

US banking agencies

Interagency guidance, June 2023

"The use of third parties does not diminish or remove banking organizations' responsibilities." A bank meets its legal duties as if the work were done in-house.

DORA, Article 28(1)

EU regulation, applies from 17 January 2025

Financial entities remain "fully responsible for compliance with, and the discharge of, all obligations under this Regulation", and manage ICT third-party risk as part of ICT risk.

OAIC

Notifiable Data Breaches guidance, February 2025

Information a provider holds for you is held jointly. An eligible data breach at one entity is an eligible data breach of every entity that holds the information.

Your organisation

The work moves to the provider. The responsibility does not.

To customers, regulators and auditors, the organisation that chose the provider answers for what the provider does with its data and its systems.

Three regimes, one position: outsourcing a service leaves the responsibility for it where it was

In Australia, a breach at your payroll provider is your breach too. The Office of the Australian Information Commissioner (OAIC) treats personal information a provider holds for you as held jointly: a breach at one entity is a breach of every entity holding the information, only one of them needs to assess and notify for the group, and the OAIC suggests the one with the most direct relationship with the affected people.

That responsibility is why several readers ask about your third parties, and each reads a different clause: an ISO/IEC 27001 auditor reads Annex A 5.19 to 5.23, a SOC 2 auditor reads criterion CC9.2, APRA reads CPS 230 and CPS 234, and an EU supervisor reads DORA Articles 28 to 30. One record has to answer all of them.

How third-party risk management works, step by step

Third-party risk management is a lifecycle with an artefact at every step, and the artefacts sit on two sides of a line. On one side is what you hold: the register entry, the tier, the decision. On the other is what you can only see through the provider's evidence and the contract. Three things cross the line, and most of the work is about them.

  • What you hold
  • The third party's side
  • Evidence and contract
  • Exposure and findings

The edge of your control

What you hold

What you see through evidence and the contract

The register entry

Provider, service, purpose, data sensitivity, contacts and the next assessment date.

The tier and its rationale

How hard you look at this party, and the one line that says why.

The decision and the acceptance

Approved, with conditions or not, and who accepted what remains, until when.

Findings

What the review found, each with an owner and a deadline.

The provider

Its people, its systems and the controls it says it runs.

The service it runs for you

Where your data sits and who on its side can reach it.

Its subcontractors

Your fourth parties. You see them only if you ask.

Its own incidents

Visible to you only through the notification clause.

The evidence

Reports and certificates: what an independent party saw.

The contract

What the provider agreed to, and what you can enforce.

The access path

The exposure: how the provider reaches your systems.

What you hold

The register entry

Provider, service, purpose, data sensitivity, contacts and the next assessment date.

The tier and its rationale

How hard you look at this party, and the one line that says why.

The decision and the acceptance

Approved, with conditions or not, and who accepted what remains, until when.

Findings

What the review found, each with an owner and a deadline.

On the line between you

The evidence

Reports and certificates: what an independent party saw.

The contract

What the provider agreed to, and what you can enforce.

The access path

The exposure: how the provider reaches your systems.

What you see through evidence and the contract

The provider

Its people, its systems and the controls it says it runs.

The service it runs for you

Where your data sits and who on its side can reach it.

Its subcontractors

Your fourth parties. You see them only if you ask.

Its own incidents

Visible to you only through the notification clause.

One third-party relationship: what you hold, what you can only see through evidence and the contract, and what crosses the line

The US banking agencies publish a five-stage lifecycle: planning; due diligence and third-party selection; contract negotiation; ongoing monitoring; and termination. It comes from the Federal Reserve, the FDIC and the OCC, in their Interagency Guidance on Third-Party Relationships: Risk Management of June 2023, and oversight and accountability, independent reviews, and documentation and reporting run across all five. Vendor guides publish four to nine stages (IBM eight, Mitratech seven, NAVEX six, Bitsight four), and the work underneath is the same.

NIST's Cybersecurity Framework 2.0 (February 2024) files the same work under Govern, as category GV.SC, with ten outcomes running from an agreed program and policies (GV.SC-01) through "Suppliers are known and prioritized by criticality" (GV.SC-04) to provisions for "activities that occur after the conclusion of a partnership or service agreement" (GV.SC-10). ID.AM-04 adds an inventory of supplier services, and ID.RA-10 asks that "Critical suppliers are assessed prior to acquisition". The ten steps below cover all of them.

  1. 01

    Write the policy and the tier rules first

    Decide what counts as a third party for you, who requests, who assesses, who approves and who accepts, and the questions that set a tier. Without it every review is argued from scratch.

    Output: A third-party risk policy with tier criteria and named roles

  2. 02

    Keep one register of every third party

    One register, including the relationships with no contract. The ISM's registers for managed and cloud services give a minimum set of columns with a source behind them.

    Output: A register: provider, service, purpose, data sensitivity, next assessment date, contract, internal contact, the provider's 24/7 contact

  3. 03

    Start at intake, and set the tier before anyone signs

    The requester records why the service is needed, what data and access it involves and what depends on it. The tier follows from four questions.

    Output: An intake record, and a tier with a one-line rationale

  4. 04

    Do due diligence at the depth the tier sets

    Ask by questionnaire only what the evidence does not answer. Read the independent evidence properly, and verify in proportion to the tier.

    Output: A scored assessment, the evidence as read, and findings

  5. 05

    Map the fourth parties and the concentrations

    Ask for the subcontractor list, mark the ones that touch your data or your operation, and look for providers shared across your third parties and for one provider doing several jobs.

    Output: A fourth-party list with the concentrations flagged

  6. 06

    Put the controls in the contract

    Turn each finding the provider will fix into a clause: notification, audit, subcontractors, data location, access, exit and termination.

    Output: A signed agreement with a security schedule

  7. 07

    Decide, and record who accepted what remains

    Approve, approve with conditions, or reject. The risk left after treatment is accepted by a named person at the right level, with conditions and an expiry.

    Output: A decision record, and an acceptance with an expiry

  8. 08

    Bring the provider into your own plans

    Set up its access as the contract says, and add it to the incident response contacts and to the continuity plan of every process that depends on it.

    Output: Access configured, incident and continuity plans updated

  9. 09

    Monitor, and reassess on the date and on the trigger

    The tier sets the next review date. Repeat audit findings, financial deterioration, breaches, data loss, service interruptions and compliance lapses bring it forward.

    Output: Dated reassessments, and findings closed against deadlines

  10. 10

    Plan the exit before you need it

    Data returned in a usable format and deleted, access revoked, transition help agreed. For a critical provider, walk through the exit on paper.

    Output: An exit plan, then a deletion record and access removed

Ten steps from intake to exit, and the artefact each one leaves behind

NIST also ranks the work. SP 800-161 Rev. 1 Update 1 makes criticality and prioritised supplier assessment foundational, puts surveys, site visits, certifications and contract language among its sustaining practices, and leaves automation for "once sustaining practices have been broadly implemented".

How a tier is set

A tier decides how hard you look, so it has to come from the exposure rather than the invoice. Four questions carry it, each with a source. The first is the data the party holds: CPS 234 paragraph 16 scales the assessment of a third party to "the potential consequences of an information security incident affecting those assets", and the ISM's service registers record the data's sensitivity. The second is the access it has into your systems, the same test applied to systems. The third is what stops if it fails: GV.SC-04's criticality, and the US agencies' critical activities, which each organisation identifies for itself. The fourth is how hard the party would be to replace, which DORA Article 29(1) asks before any contract. The figure carries the answers from the worked example.

  • Corvane's answers and tier
  • The tier model
  • What each tier gets

Four questions at intake, with Corvane's answers

What data does it hold?

NoneInternalConfidentialRestricted

Corvane Employee records and customer shipment data

What access does it have into your systems?

NoneData exchangeUserPrivileged

Corvane Privileged, on every server

What stops if it fails?

Nothing muchAn internal taskA customer serviceA critical operation

Corvane Warehouse dispatch

How hard is it to replace?

WeeksMonthsAbout a yearNo alternative

Corvane About a year

The tier

CriticalHighMediumLow

Rationale: privileged access to every server, supporting warehouse dispatch.

Four questions at intake, with Corvane's answers

What data does it hold?

NoneInternalConfidentialRestricted

Corvane Employee records and customer shipment data

What access does it have into your systems?

NoneData exchangeUserPrivileged

Corvane Privileged, on every server

What stops if it fails?

Nothing muchAn internal taskA customer serviceA critical operation

Corvane Warehouse dispatch

How hard is it to replace?

WeeksMonthsAbout a yearNo alternative

Corvane About a year

The tier

CriticalHighMediumLow

Rationale: privileged access to every server, supporting warehouse dispatch.

Tier

Due diligence

Contract

Who accepts

Review

Critical

Questionnaire, independent evidence read in full, the subcontractor list, and how they reach your systems

Full security schedule

The executive who owns the operation

Shortest interval, plus triggers

High

Questionnaire and independent evidence

Security schedule

The CISO

Shorter interval, plus triggers

Medium

Desk research and the evidence on file

Standard security terms

The system owner

Standard interval

Low

Desk research

Standard terms

The system owner

Longest interval

Critical

Due diligence
Questionnaire, independent evidence read in full, the subcontractor list, and how they reach your systems
Contract
Full security schedule
Who accepts
The executive who owns the operation
Review
Shortest interval, plus triggers

High

Due diligence
Questionnaire and independent evidence
Contract
Security schedule
Who accepts
The CISO
Review
Shorter interval, plus triggers

Medium

Due diligence
Desk research and the evidence on file
Contract
Standard security terms
Who accepts
The system owner
Review
Standard interval

Low

Due diligence
Desk research
Contract
Standard terms
Who accepts
The system owner
Review
Longest interval

What each tier gets, in Harbourline's policy

Four questions set the tier, and the tier sets the depth. The weights and the number of tiers are each organisation's own

The weights and the number of tiers are each organisation's own; none of these regimes prescribes them. Depth follows the tier. At the lowest, desk research and the evidence on file may be enough. At the highest, due diligence reads the independent evidence in full, asks for the subcontractor list and examines how the provider will reach your systems. NIST SP 1326 (July 2026) names five components of due diligence on ICT suppliers: foreign ownership, control or influence; provenance; resilience; foundational cyber practices; and supply chain tiers. For APRA-regulated entities, CPS 234 paragraphs 16, 22 and 28 add the security half: assess the third party's capability, evaluate the design of its controls, and check any control testing you rely on.

How to read a SOC 2 report

Every guide says to collect a SOC 2 report; reading it is the work. The AICPA's description criteria require the system description to disclose any subservice organisation, meaning the provider's own providers, by one of two methods. Under the inclusive method its controls are disclosed and tested. Under the carve-out method only the types of controls assumed there are disclosed, and nothing is tested. The report must also list complementary user entity controls: the controls the provider assumes its customer runs.

So a carved-out subservice organisation is a fourth party the auditor did not test, and a complementary user entity control is one you must run yourself for the report's assurance to hold. Read those, then the scope, the period and the exceptions.

Fourth parties and concentration

A fourth party is "a party a service provider relies on in delivering services to the entity", in CPS 230's definition. NIST asks criticality analysis to reach "fourth- and fifth-party suppliers", and names the case that matters most: "third-party suppliers receiving critical input or services from a common fourth-party supplier". That is concentration through a shared fourth party.

The simpler form is one provider doing several jobs, which the US agencies list as "dependency on a single provider for multiple activities". DORA Article 29 requires a concentration assessment before contracting: whether the provider is easily substitutable, and whether the entity would hold several arrangements with the same or closely connected providers. CPS 230 paragraph 47(c) brings the fourth parties behind material service providers into policy, and the CPS 230 guide covers those paragraphs in full.

  • You
  • Third and fourth parties
  • A shared fourth party

You

Relies on

Which rely on

You

Harbourline Logistics

Freight and warehousing, Brisbane

3rd party

Corvane Managed Services

IT operations: service desk, servers, patching and backups

3rd party

Warehouse management software provider

Runs the dispatch system as a cloud service

3rd party

Telematics provider

Vehicle tracking across the fleet

4th party

Remote monitoring and management platform

Corvane's management tool, with an agent on every server

4th party

After-hours service desk, Manila

Corvane's subcontractor, with remote access to customer systems

4th party · shared

One cloud provider, one region

Holds Corvane's backup storage and hosts the warehouse management software

Shared: one outage takes the system and its backups

Subcontractor list not yet requested

You

Harbourline Logistics

Freight and warehousing, Brisbane

3rd party

Corvane Managed Services

IT operations: service desk, servers, patching and backups

4th party

Remote monitoring and management platform

Corvane's management tool, with an agent on every server

4th party

After-hours service desk, Manila

Corvane's subcontractor, with remote access to customer systems

4th party · shared

One cloud provider, one region

Holds Corvane's backup storage and hosts the warehouse management software

Shared: one outage takes the system and its backups

3rd party

Warehouse management software provider

Runs the dispatch system as a cloud service

4th party · shared

One cloud provider, one region

Holds Corvane's backup storage and hosts the warehouse management software

Shared: one outage takes the system and its backups

3rd party

Telematics provider

Vehicle tracking across the fleet

Subcontractor list not yet requested

Your third parties' providers are your fourth parties, and one they share is a concentration

The clauses that carry the controls

A finding the provider agrees to fix belongs in the contract, or it stays a promise. The US agencies list sixteen contract topics, from the scope of the arrangement to default and termination. DORA Article 30(2) sets terms for every ICT contract, and Article 30(3) adds more for critical or important functions, including exit strategies with a mandatory transition period. The ISM writes each clause as its own control, and GDPR Article 28 bars a processor from engaging another without the controller's prior written authorisation.

  • What the clause gives you
  • Who asks for it
  • The clause the worked example turned on

Clause

What it gives you

Who asks for it by name

Incident notification

You hear about an incident at the provider as soon as possible after it is discovered, and about unauthorised access to your systems immediately, at a contact you named.

ISM-0141ISM-1576DORA 30(3)(b)

Right to audit and verify

You can check the provider's controls yourself, and the ISM expects the right to be exercised regularly.

ISM-1571ISM-1738DORA 30(3)(e)US agencies (d)CPS 230 para 53

Subcontractors named, notified and bound

You know who else handles your data, and you hear before that list changes.

ISM-1395ISM-1794DORA 30(2)(a)US agencies (n)GDPR 28(2)CPS 230 para 53

Data location

You know which regions hold your data, with notice before that changes.

ISM-1572DORA 30(2)(b)

Security requirements and their review

The security you assessed is written down, and reviewed while the contract runs.

ISM-0072DORA 30(2)(c)DORA 30(3)(c)US agencies (h)

Provider access to your systems

The provider reaches your systems only with the tools, addresses and time windows you approved, and you keep the log.

ISM-1073ISM-2124ISM-2125

Exit and the return of data

Your data comes back in a format you can use, the provider deletes its copy, and you get notice before the service stops.

ISM-1574ISM-1575DORA 30(2)(d)DORA 30(3)(f)GDPR 28(3)(g)CPS 230 para 55(d)

Termination and break clauses

You can leave a provider that fails its security requirements without waiting for the term to run out.

ISM-1804DORA 28(7)DORA 30(2)(h)US agencies (p)CPS 230 para 53
Eight clauses that carry most of the controls, and the documents that ask for each one by name

The access row is the newest. ISM-1073 says a provider does not access or administer your systems without a contractual arrangement. ISM-2124, new in September 2026, restricts that access "to remote management tools, source network addresses and time windows explicitly approved by the organisation". ISM-2125, also new, requires it to be "independently logged by the organisation in a manner that the service provider cannot modify or delete". ASD calls these "additional safeguards rather than ... substitutes" for the measures that apply to any privileged user, such as individually attributable accounts and multi-factor authentication.

Deciding, monitoring and exit

The decision is approve, approve with conditions, or reject, and the risk that remains is accepted by a named person at the level the tier demands. The ISM says it plainly for cloud: an organisation "will still need to decide whether a particular outsourced cloud service represents an acceptable security risk". The risk register guide covers the mechanics of an acceptance; none of them change when the risk sits with a supplier.

Monitoring runs on two clocks: the review date the tier sets, and triggers that bring it forward. The US agencies list the triggers: "material or repeat audit findings, deterioration in financial condition, security breaches, data loss, service interruptions, compliance lapses, or other indicators of increased risk". Monitoring "may be conducted on a periodic or continuous basis", more often where the relationship supports higher-risk activities. Several vendor pages make continuous monitoring a stage; the regulator leaves the choice to you.

Exit is planned at the start. GV.SC-10, the agencies' termination stage, DORA Article 28(8) and CPS 230 paragraph 55(d) all ask for it, and the ISM writes the mechanics into the contract: portable data that allows migration "without any loss of data" (ISM-1574) and one month's notice before the service ends (ISM-1575).

A worked example: a logistics company hands its IT operations to a managed service provider

Harbourline Logistics is a freight and warehousing company of 1,800 people, with its head office in Brisbane and eleven distribution centres. It is certified to ISO/IEC 27001:2022, with a surveillance audit due in March 2027. It is not regulated by APRA, which is the point: third-party risk management is not a banking discipline. All names and figures here are fictional.

The intake. On 22 June 2026 the Chief Information Officer, Andrew Kerr, files an intake to hand day-to-day IT operations to Corvane Managed Services from 1 September 2026: the service desk, server and endpoint management, patching and backups, including administration of the warehouse management system. It records the four answers the tier needs. Corvane will handle employee records and customer shipment data, classified Confidential, with privileged access to every server. Warehouse dispatch stops if it fails, and replacing it would take about a year.

The tier. On 24 June the analyst, Lena Vos, tiers Corvane Critical: privileged access to every server, supporting warehouse dispatch. The Chief Information Security Officer (CISO), Nadia Haddad, approves the intake on 25 June, so neither the requester nor the analyst approves their own work.

Due diligence. The questionnaire goes out on 29 June and comes back on 17 July. Corvane's SOC 2 Type 2 report, covering 1 April 2025 to 31 March 2026, and its ISO/IEC 27001 certificate arrive on 3 July. Lena Vos reads the report in five places.

  • Read and in order
  • An exception
  • Now your control
  • Not tested, or not there

SOC 2 Type 2 report

Corvane Managed Services

Section 1

Independent service auditor's report

12

Section 2

Management's assertion

Section 3

Description of the system

45

Section 4

Controls, tests and results

3
  1. 1

    ScopeIn order

    Managed infrastructure services from the Brisbane and Sydney operations centres. The services Harbourline is buying sit inside it.

  2. 2

    PeriodIn order

    Type 2, 1 April 2025 to 31 March 2026: controls tested over twelve months, ending three months before the review.

  3. 3

    ExceptionsBecame F-3

    One: administrator accounts of leavers removed late in two of 25 samples. The same access Harbourline is about to grant.

  4. 4

    Complementary user entity controlsNow Harbourline's

    The customer reviews the provider accounts with access to its systems each quarter. The report only holds if Harbourline runs this.

  5. 5

    Subservice organisationsBecame F-2 and F-4

    The management platform vendor and the backup storage provider are carved out, so not tested. The Manila after-hours desk is not mentioned at all.

Five places to read in a SOC 2 report, on Corvane's. A carved-out subservice organisation is a fourth party the auditor did not test

Three of the five matter more than the clean opinion. The exception concerns the very access Harbourline is about to grant. The user entity control, a quarterly review of the Corvane accounts that can reach the customer's systems, is now Harbourline's, and nobody runs it yet. The two carve-outs are fourth parties the auditor never tested.

Fourth parties. Lena Vos asks for the subcontractor list on 14 July and receives it on 21 July. It names an after-hours service desk in Manila, with remote access to customer systems, that appears in neither the SOC 2 report nor the proposal. It also shows Corvane's backup storage with the same cloud provider, in the same region, as Harbourline's warehouse management software: one regional outage would take the system and its backups together.

The findings. The assessment closes on 29 July with five.

  1. F-1 is rated High. One shared administrator account reaches every server through Corvane's management agent, from any address, at any time, and it must close before go-live.
  2. F-2 is rated High. The Manila desk has remote access and is not under contract, and the fix names it as a subcontractor, states its regions, requires one month's notice of change (ISM-1794, ISM-1572) and puts it inside the audit right.
  3. F-3 is rated Medium and records the SOC 2 exception. The fix is evidence that the two later quarters were clean, plus Harbourline's own quarterly account review.
  4. F-4 is rated Medium. Production and backups run through one tool, and the backups share a region with the warehouse system. That is the US agencies' single provider for multiple activities and NIST's common fourth party in one finding.
  5. F-5 is rated Low, because the proposal has no exit terms. The fix is the return of configuration, credentials and documentation, a data export in a documented format, a deletion record and one month's notice of cessation (ISM-1574, ISM-1575).

Four of the five are about how Corvane reaches Harbourline's systems and what it holds when it does.

  • As proposed
  • The finding
  • As contracted

As proposed

As contracted, 21 August

Accounts

One shared administrator account for every Corvane engineer.

F-1

Accounts

A named account for each engineer, with multi-factor authentication.

Reach

The management agent on every server, reachable from any address at any time.

F-1

Reach

Reachable only from two Corvane address ranges, in change windows Harbourline approves (ISM-2124).

Logs

Session logs kept in Corvane's own console.

F-1

Logs

Every session logged to Harbourline's own log store, which Corvane cannot change or delete (ISM-2125).

Backups

Backups run through the same tool, stored in the same cloud region as the warehouse system.

F-4

Backups

An immutable copy of critical backups in a Harbourline account in another region, outside Corvane's administration.

Unauthorised access

Not covered in the proposal.

Unauthorised access

Treated as a cyber security incident, with immediate notice to Harbourline (ISM-1576).

Accounts · as proposed

One shared administrator account for every Corvane engineer.

F-1

Accounts · as contracted

A named account for each engineer, with multi-factor authentication.

Reach · as proposed

The management agent on every server, reachable from any address at any time.

F-1

Reach · as contracted

Reachable only from two Corvane address ranges, in change windows Harbourline approves (ISM-2124).

Logs · as proposed

Session logs kept in Corvane's own console.

F-1

Logs · as contracted

Every session logged to Harbourline's own log store, which Corvane cannot change or delete (ISM-2125).

Backups · as proposed

Backups run through the same tool, stored in the same cloud region as the warehouse system.

F-4

Backups · as contracted

An immutable copy of critical backups in a Harbourline account in another region, outside Corvane's administration.

Unauthorised access · as proposed

Not covered in the proposal.

Unauthorised access · as contracted

Treated as a cyber security incident, with immediate notice to Harbourline (ISM-1576).

How Corvane reaches Harbourline's servers, as proposed and as contracted, and the findings that changed it

The contract. The security schedule is agreed on 12 August, closing F-2 and F-5, and the contract is signed on 21 August 2026. It requires notice of any incident as soon as possible and within 24 hours of discovery, a figure Harbourline set on top of ISM-0141's "as soon as possible". It treats unauthorised access by Corvane as a cyber security incident, notified to Harbourline immediately (ISM-1576), adds an audit right exercised each year (ISM-1571, ISM-1738), names the subcontractors, states where data is held, and carries the access terms, the exit terms and a break clause for failing security requirements (ISM-1804). F-3 closes on 18 August.

The decision. On 19 August the Chief Operating Officer, Rosa Delgado, as business owner of warehouse operations, accepts the residual risk of one provider holding privileged access to production and to the primary backups. Her three conditions: F-1 closed before go-live; Corvane's privileged sessions reviewed weekly until an immutable backup copy is live; and that copy live by 30 September. The acceptance expires on 31 March 2027. The person who owns the operation that stops if Corvane fails is the person who carries the risk.

Into Harbourline's own plans. F-1 closes on 28 August, and Corvane goes live on 1 September 2026. It is on the incident response contact list, and the continuity plan for warehouse dispatch names Corvane as a dependency with the restore path from the immutable copy, which goes live on 30 September and treats F-4. The next full reassessment is 1 March 2027, sooner on a change notice from Corvane, a breach at Corvane or a listed subcontractor, a new SOC 2 report with exceptions, or a change to the services.

Third party · Corvane Managed Services

Active · tier Critical

IT operations from 1 September 2026: service desk, server and endpoint management, patching and backups, including administration of the warehouse management system.

Tier rationale
Privileged access to every server, supporting warehouse dispatch. Set 24 June 2026.

Evidence

SOC 2 Type 2
1 April 2025 to 31 March 2026, received 3 July 2026. Read to its exception, its user entity control and its two carve-outs.
ISO/IEC 27001
Certificate received 3 July 2026, scope managed infrastructure services.
Questionnaire
Issued 29 June, returned 17 July 2026, scored by Lena Vos.
Subcontractors
List requested 14 July, received 21 July 2026.

Findings

ID

Severity

Finding

Owner

Due

Status

  • F-1

    High

    Shared administrator account, reachable from anywhere

    Andrew Kerr

    31 Aug 2026

    Closed 28 Aug

  • F-2

    High

    Manila after-hours desk not under contract

    Lena Vos

    21 Aug 2026

    Closed 12 Aug

  • F-3

    Medium

    SOC 2 exception on leavers' accounts

    Lena Vos

    31 Aug 2026

    Closed 18 Aug

  • F-4

    Medium

    Production and backups behind one tool and one region

    Andrew Kerr

    30 Sep 2026

    Treated 30 Sep

  • F-5

    Low

    No exit or transition terms

    Lena Vos

    21 Aug 2026

    Closed 12 Aug

  • F-1 · HighClosed 28 Aug

    Shared administrator account, reachable from anywhere

    Owner Andrew Kerr · due 31 Aug 2026

  • F-2 · HighClosed 12 Aug

    Manila after-hours desk not under contract

    Owner Lena Vos · due 21 Aug 2026

  • F-3 · MediumClosed 18 Aug

    SOC 2 exception on leavers' accounts

    Owner Lena Vos · due 31 Aug 2026

  • F-4 · MediumTreated 30 Sep

    Production and backups behind one tool and one region

    Owner Andrew Kerr · due 30 Sep 2026

  • F-5 · LowClosed 12 Aug

    No exit or transition terms

    Owner Lena Vos · due 21 Aug 2026

Contract

Security schedule
Agreed 12 August 2026. Contract signed 21 August 2026.
Incident notice within 24 hoursUnauthorised access is an incidentAnnual audit rightNamed subcontractors, notice of changeData locationProvider access termsExit termsBreak clause

The acceptance

Accepted by Rosa Delgado, Chief Operating Officer and business owner of warehouse operations, on 19 August 2026.

Risk accepted
One provider holds privileged access to production and to the primary backups.

Conditions

  1. 01F-1 closed before go-live.
  2. 02Corvane's privileged sessions reviewed weekly until the immutable backup copy is live.
  3. 03The immutable copy live by 30 September 2026.
Expires
31 March 2027.
Residual rating
Medium, recorded at the moment of acceptance.

Review and fourth parties

Next review
1 March 2027, earlier on a change notice, a breach, a new report with exceptions or a change of service.
Management platform vendorAfter-hours desk, ManilaCloud provider, backup storage
  • The third party and its providers
  • Evidence and closure
  • Findings
  • Contract and decision
Corvane's record as the ISO 27001 auditor opens it in March 2027

The audit walk, March 2027. The ISO 27001 auditor walks Annex A 5.19 to 5.23. Control 5.19 gets the policy and the tier, 5.20 the security schedule, 5.21 the subcontractor list and F-2, and 5.22 the review date, the change-notice clause and the weekly session reviews. Control 5.23 covers cloud services Harbourline uses directly, so the warehouse management software's own record answers it. What Harbourline holds is short: one tier with a reason, one SOC 2 report read to its carve-outs, five findings closed against dates, one signed schedule and one acceptance with an owner and an expiry.

Common mistakes

Eight failure modes share one root: the vendor file records that a review happened, and leaves out what it found and who decided. Here is Corvane written both ways.

  • A spreadsheet row
  • The numbered mistake
  • A managed relationship

Corvane · IT · the spreadsheet

Mistake

Corvane · the record

Risk: Medium, set from the contract value
1
Tier Critical: privileged access to every server, supporting warehouse dispatch.
Questionnaire: returned
2
Questionnaire scored, and checked against the SOC 2 report and the ISO certificate.
SOC 2: yes
3
SOC 2 read: one exception, one control Harbourline now runs, two carve-outs.
Contract: on file
48
Security schedule built from the findings, with exit terms, signed 21 August 2026.
No column for subcontractors
5
Subcontractors named, including the Manila desk and the shared cloud region.
Reviewed: at signing
6
Next review 1 March 2027, earlier on a change notice, a breach or a report with exceptions.
Owner: blank
7
Residual risk accepted by Rosa Delgado, with three conditions, until 31 March 2027.
Risk: Medium, set from the contract value
1
Tier Critical: privileged access to every server, supporting warehouse dispatch.
Questionnaire: returned
2
Questionnaire scored, and checked against the SOC 2 report and the ISO certificate.
SOC 2: yes
3
SOC 2 read: one exception, one control Harbourline now runs, two carve-outs.
Contract: on file
48
Security schedule built from the findings, with exit terms, signed 21 August 2026.
No column for subcontractors
5
Subcontractors named, including the Manila desk and the shared cloud region.
Reviewed: at signing
6
Next review 1 March 2027, earlier on a change notice, a breach or a report with exceptions.
Owner: blank
7
Residual risk accepted by Rosa Delgado, with three conditions, until 31 March 2027.
Corvane as a spreadsheet row and as a managed relationship, with the mistake each cell shows
  1. Tiering by spend or by the provider's size. A cheap tool with administrator access outranks an expensive supplier that never touches your data. Tier on data, access, what stops and how hard the party is to replace.
  2. Sending every provider the same long questionnaire and treating the answers as evidence. A questionnaire records what the provider says about itself. Set the depth by tier, and corroborate with independent evidence; NIST lists surveys, on-site visits and certifications together as confidence-building mechanisms.
  3. Filing "SOC 2: yes". Read the scope, the period, the exceptions, the user entity controls and the carve-outs, and adopt the user entity controls as your own.
  4. Signing before the review finishes. After signature the provider has no reason to accept new controls. Start at intake, as GV.SC-06 asks, and turn each finding into a clause.
  5. Stopping at the third party. Ask for the subcontractor list, require notice of any change to it (ISM-1794, and GDPR Article 28(2) for processors), and look for shared providers and for one provider doing several jobs.
  6. Reviewing once, at signing. Set the next review date from the tier, and write down the triggers that bring it forward.
  7. Leaving the residual risk accepted by nobody, or by procurement, with no expiry. A named person at the level the tier demands accepts it, with conditions and a date it comes back.
  8. Having no exit plan. Write the exit terms into the contract, and walk through the exit for a critical provider on paper before you need it.

Third-party risk management compared with its neighbours

Five names cover overlapping work. They differ in what they examine, the product you acquire or the relationship you depend on, and in which risks they count. Security questionnaires and security ratings are tools used inside the program, never a substitute for it.

  • Third-party risk management
  • Regulator-defined
  • Procurement-led
  • A NIST framework term

Every risk type

Supplier risk management

Procurement's discipline: a supplier's financial health, delivery, quality, sanctions and ethics.

Third-party risk management

Every outside party you rely on, every risk type, over the whole relationship.

Outsourcing and material service providers

The regulator's version, with registers that go to the regulator: CPS 230, DORA, the EBA guidelines.

Vendor risk management

The same work for the parties you buy from, usually led by security. Same method, smaller boundary.

Tools used inside itSecurity questionnairesSecurity ratings

Security and information risk

Cyber supply chain risk management

NIST's term: the security of the products and services you acquire, down to components and provenance.

The product you acquire

The relationship you depend on

Third-party risk management

The relationship · every risk type

Every outside party you rely on, every risk type, over the whole relationship.

Outsourcing and material service providers

The regulator's version, with registers that go to the regulator: CPS 230, DORA, the EBA guidelines.

Vendor risk management

The same work for the parties you buy from, usually led by security. Same method, smaller boundary.

Tools used inside itSecurity questionnairesSecurity ratings

The product · every risk type

Supplier risk management

Procurement's discipline: a supplier's financial health, delivery, quality, sanctions and ethics.

The product · security risk

Cyber supply chain risk management

NIST's term: the security of the products and services you acquire, down to components and provenance.

Five names for overlapping work, placed by what they examine and which risks they count
Third-party risk management and the terms nearest to it, and when each one is the right thing to reach for
TermWhat it isReach for it when
Third-party risk managementEvery outside party you rely on, every risk type, over the whole relationship from intake to exit.You want one program and one register for everyone you depend on, contract or not.
Vendor risk managementThe same work for the parties you buy from, usually led by security and compliance.The name fits a smaller organisation better. Nothing in the method changes.
Supplier risk managementProcurement's discipline for a supplier's financial health, delivery, quality, sanctions and ethics.The risk is the supply of goods. Share the inventory with the third-party program so nobody is tracked twice.
Cyber supply chain risk management (C-SCRM)NIST's term, in SP 800-161 Rev. 1 Update 1 and CSF 2.0's GV.SC, for the security of the products and services you acquire, down to components and provenance.You buy or build technology and need to know what is inside it, such as its components and where they came from.
Outsourcing and material service provider managementThe prudential form: CPS 230, DORA's critical or important functions and the EBA guidelines, with registers that go to the regulator.You are regulated and the provider supports a critical operation. The CPS 230 guide covers the Australian version.
Security questionnaires and security ratingsTools inside the program. A questionnaire collects the provider's own answers; a rating scores its internet-facing posture from outside.You need inputs to due diligence. Neither one is the decision.
Business continuity dependency mappingWhich business processes depend on which providers, and what happens to each process when one fails.The question is what stops, rather than how secure the provider is.
Risk registerThe record of the risks an organisation has identified, what it decided about each, and who decided.A third-party risk remains after treatment and needs an owner, a decision and a date it comes back.
Third-party risk management and the terms nearest to it, and when each one is the right thing to reach for

Standards and references

Most of what is published on this subject is out of date. The EBA's 2019 outsourcing guidelines, OCC Bulletin 2013-29 and the CPS 230 that commenced in July 2025 have each been replaced, and the edition of NIST SP 800-161 to cite is Rev. 1 Update 1.

  • Regulators and government
  • Voluntary standards
  • What it replaced
  • December 2025 to September 2026

Regulators and government

Voluntary standards

Jul 2019

APRA CPS 234 in force

Information security, including information assets managed by third parties.

2021 to 2023

ISO/IEC 27036 parts 1 to 3

Supplier relationships: concepts, requirements, and supply chain security for hardware, software and services.

Oct 2022

ISO/IEC 27001:2022

Annex A 5.19 to 5.23 on supplier relationships, with 5.23 on cloud services.

Dec 2022

DORA adopted

Articles 28 to 30 on ICT third-party risk. Applies from 17 January 2025.

Jun 2023

US interagency guidance

Five lifecycle stages and sixteen contract topics for US banks.

Replaced OCC Bulletins 2013-29 and 2020-10, the Federal Reserve's 2013 and the FDIC's 2008 guidance

Feb 2024

NIST CSF 2.0

Supply chain risk management becomes a Govern category, GV.SC.

Nov 2024

DORA register templates

Implementing Regulation (EU) 2024/2956 fixes the register of information.

NIST SP 800-161 Rev. 1 Update 1

References moved to CSF 2.0.

Replaced The May 2022 text, as the edition to cite

Nov 2025

First critical ICT providers designated

The ESAs bring them under direct EU oversight.

The last ten months

Dec 2025

Basel principles

A common baseline for banks and supervisors.

Replaced The Joint Forum's 2005 Outsourcing in financial services, for banks

Jul 2026

APRA CPS 230, re-made

Commenced 1 July 2026. Service providers at paragraphs 46 to 61.

Replaced The CPS 230 that commenced on 1 July 2025

NIST SP 1326

A due diligence quick-start guide for ICT suppliers.

Sep 2026

EBA third-party guidelines

Full lifecycle, aligned with DORA, two-year transition.

Replaced The 2019 Guidelines on outsourcing arrangements

ASD ISM, September 2026

ISM-2124 and ISM-2125 on how a service provider reaches your systems.

Jul 2019

APRA CPS 234 in force

Information security, including information assets managed by third parties.

2021 to 2023

ISO/IEC 27036 parts 1 to 3

Supplier relationships: concepts, requirements, and supply chain security for hardware, software and services.

Oct 2022

ISO/IEC 27001:2022

Annex A 5.19 to 5.23 on supplier relationships, with 5.23 on cloud services.

Dec 2022

DORA adopted

Articles 28 to 30 on ICT third-party risk. Applies from 17 January 2025.

Jun 2023

US interagency guidance

Five lifecycle stages and sixteen contract topics for US banks.

Replaced OCC Bulletins 2013-29 and 2020-10, the Federal Reserve's 2013 and the FDIC's 2008 guidance

Feb 2024

NIST CSF 2.0

Supply chain risk management becomes a Govern category, GV.SC.

Nov 2024

DORA register templates

Implementing Regulation (EU) 2024/2956 fixes the register of information.

Nov 2024

NIST SP 800-161 Rev. 1 Update 1

References moved to CSF 2.0.

Replaced The May 2022 text, as the edition to cite

Nov 2025

First critical ICT providers designated

The ESAs bring them under direct EU oversight.

The last ten months

Dec 2025

Basel principles

A common baseline for banks and supervisors.

Replaced The Joint Forum's 2005 Outsourcing in financial services, for banks

Jul 2026

APRA CPS 230, re-made

Commenced 1 July 2026. Service providers at paragraphs 46 to 61.

Replaced The CPS 230 that commenced on 1 July 2025

Jul 2026

NIST SP 1326

A due diligence quick-start guide for ICT suppliers.

Sep 2026

EBA third-party guidelines

Full lifecycle, aligned with DORA, two-year transition.

Replaced The 2019 Guidelines on outsourcing arrangements

Sep 2026

ASD ISM, September 2026

ISM-2124 and ISM-2125 on how a service provider reaches your systems.

The third-party rulebook by date, what each document replaced, and the ten months that changed it

US interagency guidance (Federal Reserve, FDIC and OCC, June 2023). Published at 88 FR 37920 on 9 June 2023. Section IV.C holds the five stages, the contract topics (a) to (p) and the monitoring triggers. It replaced the agencies' earlier guidance, including OCC Bulletins 2013-29 and 2020-10.

DORA, Regulation (EU) 2022/2554 (December 2022, applying from 17 January 2025). Articles 28 to 30, with the register templates in Implementing Regulation (EU) 2024/2956 of 29 November 2024; the first critical ICT third-party providers were designated on 18 November 2025. EUR-Lex refused automated reads, so the wording quoted here came from a text mirror and should be checked against EUR-Lex.

EBA Guidelines on the management of third-party risk (18 September 2026). They replace the 2019 outsourcing guidelines, cover the full lifecycle, align with DORA and carry a two-year transition, applying once published in all EU languages. Cited from the EBA's press release.

Basel Committee, Principles for the sound management of third-party risk (10 December 2025). A common baseline for banks and supervisors, superseding the 2005 Joint Forum paper Outsourcing in financial services for banks. Cited from the release, since the full text refused automated download.

NIST CSF 2.0 (February 2024), SP 800-161 Rev. 1 Update 1 (1 November 2024) and SP 1326 (July 2026). GV.SC, ID.AM-04 and ID.RA-10; the three tiers of practice and Appendix C on criticality; the due diligence components, read from the abstract only.

ISO/IEC 27036 and ISO/IEC 27001:2022 Annex A 5.19 to 5.23. ISO/IEC 27036 covers supplier relationships in four parts, including Part 3:2023 on hardware, software and services supply chain security; Part 2:2022 sets requirements but is not intended for certification. Annex A 5.19 to 5.23 are the supplier controls an auditor reads. ISO sells its standards, so these summaries come from dated secondary sources; check them against a licensed copy.

APRA CPS 230 (1 July 2026) and CPS 234 (1 July 2019). CPS 234 paragraphs 16, 22, 28 and 34 apply to every information asset a third party manages. The CPS 230 guide explains the service provider paragraphs.

ASD Information security manual, September 2026. The guidelines for procurement and outsourcing, including the service registers and ISM-2124 and ISM-2125. The ISM becomes an obligation through the Protective Security Policy Framework, a contract, a state policy or a direction.

GDPR Article 28, NIS2 Article 21(2)(d), and SOC 2 criterion CC9.2. The SOC 2 wording and the description criteria come from auditor explainers, chiefly Linford & Co (February 2021); check them against the AICPA's text.

How Alvor helps

With Alvor, an organisation can run third-party risk as the lifecycle this guide describes, with the separation of duties and the dates enforced by the product.

Every relationship starts as an intake filed before the vendor is engaged. The requester records why the vendor is needed, the services, a contact and a plain profile of data, access and dependence. Someone other than the requester triages and approves it, and the person who accepts the residual risk cannot be the analyst who assessed the vendor. Triage picks desk research, a vendor questionnaire, or both. Intake opens the vendor record at an intake stage; approval opens the first due diligence assessment and moves the vendor into due diligence in one step.

The tier is derived from the intake profile (the data the vendor will hold, its access, how critical the service is and how hard it would be to replace), with a one-line rationale an analyst can override. The tier sets how often the vendor is reassessed, and when a review date passes the next assessment is already waiting in draft.

The vendor answers one structured questionnaire, weighted across risk domains, in a hardened external portal with a rotating link, an emailed code, autosave and evidence upload, and needs no Alvor account. Every submission writes to the hash-chained audit log, and an analyst override keeps the vendor's original answer beside it.

The vendor record holds contacts, contracts, certifications, the scored assessment and its findings. Certifications and contracts are tracked for expiry, and each contract records its incident-notification window in hours and whether its protective clauses are present: right to audit, notice of subcontracting, return and destruction of data, data location, termination rights and the rest. Sub-processors are recorded with their country and grouped across vendors, so a provider behind several Critical or High vendors shows up as a concentration. Findings carry severity deadlines, and a daily sweep flags breaches of them.

Residual risk is accepted only by the person named to accept it, typed Business Owner, System Owner or CISO, with conditions, a scope and an expiry; the residual score is snapshotted at the decision, and the expiry is enforced on schedule. Offboarding runs as a checklist: revoke access, get the data back, obtain the destruction certificate, terminate the contract, confirm the sub-processors are informed, and repoint the dependent business processes. The register and findings export to CSV.

In Business Continuity, a business process declares the vendors it depends on, each with its own criticality, so the plan for warehouse dispatch would know it relies on Corvane. The AI Assistant is bring-your-own-model: it reads vendors, findings and assessments, answers questions such as which vendors support a Tier 1 process, and proposes any finding or status change as an approval card a person accepts. No model approves a vendor or accepts a risk.

Alvor Advisory runs a Third-Party Risk Assessment, which inventories and tiers the vendor estate by the access and data each vendor holds, and a Managed Third-Party Risk engagement that runs the program as a standing service.

Alvor runs as a dedicated single-tenant instance in the region you choose, on your own servers, or air-gapped. Third-Party Risk Management covers the module in full.

Sources

  • Board of Governors of the Federal Reserve System, FDIC and OCC, Interagency Guidance on Third-Party Relationships: Risk Management, 88 FR 379202023-06
  • OCC Bulletin 2023-17, Third-Party Relationships: Interagency Guidance on Risk Management (read October 2026)2023-06
  • Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Articles 28 to 30 and 642022-12
  • Regulation Tomorrow, DORA implementing regulation on standard templates for the register of information published, Commission Implementing Regulation (EU) 2024/29562024-12
  • EBA, EIOPA and ESMA, European Supervisory Authorities designate critical ICT third-party providers under DORA2025-11
  • EBA, EBA publishes its final Guidelines on the management of third-party risk2026-09
  • Basel Committee on Banking Supervision, Principles for the sound management of third-party risk (d605)2025-12
  • NIST CSWP 29, The NIST Cybersecurity Framework (CSF) 2.02024-02
  • NIST SP 800-161 Rev. 1 Update 1, Cybersecurity Supply Chain Risk Management Practices for Systems and Organizations2024-11
  • NIST SP 1326, Cybersecurity Supply Chain Risk Management: Due Diligence Assessment Quick-Start Guide2026-07
  • ISO/IEC 27036-2:2022, summary on iso27001security.com (read October 2026)2026-08
  • URM Consulting, ISO 27001:2022 A.5 Organisational Controls (Supplier Management)2025-04
  • APRA, CPS 230 Operational Risk Management, F2026L00475, commencing 1 July 20262026-04
  • APRA, Prudential Standard CPS 234 Information Security (read October 2026)2019-07
  • Australian Signals Directorate, Information security manual (September 2026 release), Guidelines for procurement and outsourcing2026-09
  • OAIC, Data breach preparation and response, Part 4: Notifiable Data Breach (NDB) Scheme2025-02
  • Verizon, 2026 Data Breach Investigations Report2026-05
  • Microsoft, Helping our customers through the CrowdStrike outage2024-07
  • CISA and FBI, advisory AA23-158A, CL0P Ransomware Gang Exploits CVE-2023-34362 MOVEit Vulnerability2023-06
  • Chartered Institute of Payroll Professionals, Major UK companies hit by cyber attack2023-06
  • Regulation (EU) 2016/679 (GDPR), Article 28, read on gdpr-info.eu2016-04
  • Directive (EU) 2022/2555 (NIS2), Article 212022-12
  • Linford & Co, What are Description Criteria for a SOC 2 Report?2021-02
SK

Written by

Salman KhanFounder & Principal, Alvor

Salman founded Alvor, the security architecture management and compliance platform, and leads its security architecture practice. He writes about design reviews, threat modeling, and running security programs that engineering teams don't route around.

Questions

Common questions about third-party risk management

Third-party risk management (TPRM) is how an organisation identifies, assesses, contracts for and monitors the risks of relying on outside parties: vendors, suppliers, service providers and the subcontractors behind them. It runs across the whole relationship, from the decision to engage to exit. The US banking agencies, the EU's DORA and Australia's privacy regulator all make the same point about it: the organisation that relied on the third party keeps the responsibility, so every relationship needs a tier, evidence, contract terms and a named decision on the risk that remains.

Related reading

Third-Party Risk Management in AlvorReadWhat is APRA CPS 230?ReadWhat is a risk register?ReadWhat is a cyber risk assessment?ReadWhat is GRC (governance, risk and compliance)?ReadVendor risk management in practiceReadBusiness Continuity in AlvorReadThird-party risk assessment and managed third-party riskReadISO 27001Read
← All guides
ALVOR

Security architecture management and compliance: connected into one source of truth.

Security,
Simplified.

Platform

  • Overview
  • AI Assistant
  • Secure by Design
  • Asset Management
  • Risk Management
  • Compliance
  • Policy
  • Security Management
  • Third-Party Risk Management
  • Business Continuity

Capabilities

  • Security Architecture
  • Security Design Review
  • Threat Modeling
  • Dependency Mapping
  • Data Governance
  • Components & SBOM
  • System Security Plan
  • Deployment models

Solutions

  • All solutions
  • CISO
  • Security architect
  • GRC lead
  • Engineering leader
  • Startups
  • Mid-Market
  • Enterprise
  • Regulated & Sovereign
  • Australia

Frameworks

  • ISO 27001
  • SOC 2
  • NIST CSF
  • HIPAA
  • GDPR
  • ISM
  • IRAP
  • Essential Eight
  • ASD Essentials
  • SABSA
  • PCI DSS
  • CMMC
  • FedRAMP
  • Control alignment

Advisory

  • Advisory overview
  • Assess
  • Architect
  • Build
  • Operate
  • All engagements