Third-party risk management is the work of knowing who you depend on outside your own organisation, what each of them can reach, and what you decided about the risk each one brings. Its rulebook changed three times in the last ten months. The Basel Committee on Banking Supervision published final principles for third-party risk on 10 December 2025. APRA's re-made CPS 230 commenced in Australia on 1 July 2026. On 18 September 2026 the European Banking Authority published final guidelines on the management of third-party risk, replacing its 2019 outsourcing guidelines. Alongside them, NIST released a due diligence quick-start guide in July 2026, and ASD's September 2026 Information security manual added two controls on how a service provider may reach into your systems.
The term has many synonyms because every document uses its own word: supplier for NIST and ISO, third-party relationship for the US banking agencies, ICT third-party service provider for the EU's Digital Operational Resilience Act (DORA), service provider for CPS 230, processor for the GDPR. Vendor risk management usually means the narrower set of parties you buy from. This guide says third party and means the wide set: the US agencies define a third-party relationship as "any business arrangement between a banking organization and another entity, by contract or otherwise".
Why third-party risk management matters
Third parties now sit inside nearly half of all breaches. Verizon's 2026 Data Breach Investigations Report (DBIR), covering incidents from 1 November 2024 to 31 October 2025, found third-party involvement in 48% of the breaches it analysed, up from 30% the year before: in Verizon's words, "a 60% increase, after already doubling the year before". It counts three ways a third party can be involved.
- You and your data
- The third party
- The attack path
Kind 1
A flaw in their product, running in your environment
Attacker
Your environment
The data was in your custody. The way in existed because of a flaw in a vendor's product or a compromised vendor build.
Kind 2
They hold your data
Attacker
The vendor's environment
Not on the path
Your environment
The vendor hosts your data in its own environment, and the attack lands on the vendor. Your network is never touched.
Kind 3
They have a connection into you
Attacker
The vendor's environment
Your environment
The attacker gets into the vendor first, then uses the vendor's own connection to move into your environment.
Breaches with a third party involved
2026 report
48%
2025 report
30%
Verizon calls it a 60% increase, after already doubling the year before. All three kinds count, so the figure is broader than a supplier being breached.
The first kind includes an exploited flaw in a product you run yourself, so the 48% is broader than "a supplier was breached". The third kind does the most damage per relationship, because the attacker arrives with access you granted on purpose. The worked example below deals with it.
Not every third-party failure has an attacker in it. On 19 July 2024 a faulty CrowdStrike update took Windows machines down around the world, and Microsoft estimated it "affected 8.5 million Windows devices, or less than one percent of all Windows machines". One provider and one update produced a worldwide outage. That is concentration risk, and no questionnaire answer would have predicted it.
The risk also reaches past the party you contracted. The CL0P ransomware group began exploiting CVE-2023-34362, an SQL injection flaw in Progress Software's MOVEit Transfer, on 27 May 2023, according to CISA and FBI advisory AA23-158A. On 6 June 2023 Zellis, a UK payroll provider that used MOVEit, confirmed that some of its customers had been affected; British Airways, the BBC, Boots and Aer Lingus were among them. For British Airways, Zellis was the third party and MOVEit the fourth.
Every regime that touches the subject agrees that the organisation relying on the third party keeps the responsibility.
- What the rule says
- Where the responsibility sits
US banking agencies
Interagency guidance, June 2023
"The use of third parties does not diminish or remove banking organizations' responsibilities." A bank meets its legal duties as if the work were done in-house.
DORA, Article 28(1)
EU regulation, applies from 17 January 2025
Financial entities remain "fully responsible for compliance with, and the discharge of, all obligations under this Regulation", and manage ICT third-party risk as part of ICT risk.
OAIC
Notifiable Data Breaches guidance, February 2025
Information a provider holds for you is held jointly. An eligible data breach at one entity is an eligible data breach of every entity that holds the information.
Your organisation
The work moves to the provider. The responsibility does not.
To customers, regulators and auditors, the organisation that chose the provider answers for what the provider does with its data and its systems.
In Australia, a breach at your payroll provider is your breach too. The Office of the Australian Information Commissioner (OAIC) treats personal information a provider holds for you as held jointly: a breach at one entity is a breach of every entity holding the information, only one of them needs to assess and notify for the group, and the OAIC suggests the one with the most direct relationship with the affected people.
That responsibility is why several readers ask about your third parties, and each reads a different clause: an ISO/IEC 27001 auditor reads Annex A 5.19 to 5.23, a SOC 2 auditor reads criterion CC9.2, APRA reads CPS 230 and CPS 234, and an EU supervisor reads DORA Articles 28 to 30. One record has to answer all of them.
How third-party risk management works, step by step
Third-party risk management is a lifecycle with an artefact at every step, and the artefacts sit on two sides of a line. On one side is what you hold: the register entry, the tier, the decision. On the other is what you can only see through the provider's evidence and the contract. Three things cross the line, and most of the work is about them.
- What you hold
- The third party's side
- Evidence and contract
- Exposure and findings
The edge of your control
What you hold
The register entry
Provider, service, purpose, data sensitivity, contacts and the next assessment date.
The tier and its rationale
How hard you look at this party, and the one line that says why.
The decision and the acceptance
Approved, with conditions or not, and who accepted what remains, until when.
Findings
What the review found, each with an owner and a deadline.
On the line between you
The evidence
Reports and certificates: what an independent party saw.
The contract
What the provider agreed to, and what you can enforce.
The access path
The exposure: how the provider reaches your systems.
What you see through evidence and the contract
The provider
Its people, its systems and the controls it says it runs.
The service it runs for you
Where your data sits and who on its side can reach it.
Its subcontractors
Your fourth parties. You see them only if you ask.
Its own incidents
Visible to you only through the notification clause.
The US banking agencies publish a five-stage lifecycle: planning; due diligence and third-party selection; contract negotiation; ongoing monitoring; and termination. It comes from the Federal Reserve, the FDIC and the OCC, in their Interagency Guidance on Third-Party Relationships: Risk Management of June 2023, and oversight and accountability, independent reviews, and documentation and reporting run across all five. Vendor guides publish four to nine stages (IBM eight, Mitratech seven, NAVEX six, Bitsight four), and the work underneath is the same.
NIST's Cybersecurity Framework 2.0 (February 2024) files the same work under Govern, as category GV.SC, with ten outcomes running from an agreed program and policies (GV.SC-01) through "Suppliers are known and prioritized by criticality" (GV.SC-04) to provisions for "activities that occur after the conclusion of a partnership or service agreement" (GV.SC-10). ID.AM-04 adds an inventory of supplier services, and ID.RA-10 asks that "Critical suppliers are assessed prior to acquisition". The ten steps below cover all of them.
- 01
Write the policy and the tier rules first
Decide what counts as a third party for you, who requests, who assesses, who approves and who accepts, and the questions that set a tier. Without it every review is argued from scratch.
Output: A third-party risk policy with tier criteria and named roles
- 02
Keep one register of every third party
One register, including the relationships with no contract. The ISM's registers for managed and cloud services give a minimum set of columns with a source behind them.
Output: A register: provider, service, purpose, data sensitivity, next assessment date, contract, internal contact, the provider's 24/7 contact
- 03
Start at intake, and set the tier before anyone signs
The requester records why the service is needed, what data and access it involves and what depends on it. The tier follows from four questions.
Output: An intake record, and a tier with a one-line rationale
- 04
Do due diligence at the depth the tier sets
Ask by questionnaire only what the evidence does not answer. Read the independent evidence properly, and verify in proportion to the tier.
Output: A scored assessment, the evidence as read, and findings
- 05
Map the fourth parties and the concentrations
Ask for the subcontractor list, mark the ones that touch your data or your operation, and look for providers shared across your third parties and for one provider doing several jobs.
Output: A fourth-party list with the concentrations flagged
- 06
Put the controls in the contract
Turn each finding the provider will fix into a clause: notification, audit, subcontractors, data location, access, exit and termination.
Output: A signed agreement with a security schedule
- 07
Decide, and record who accepted what remains
Approve, approve with conditions, or reject. The risk left after treatment is accepted by a named person at the right level, with conditions and an expiry.
Output: A decision record, and an acceptance with an expiry
- 08
Bring the provider into your own plans
Set up its access as the contract says, and add it to the incident response contacts and to the continuity plan of every process that depends on it.
Output: Access configured, incident and continuity plans updated
- 09
Monitor, and reassess on the date and on the trigger
The tier sets the next review date. Repeat audit findings, financial deterioration, breaches, data loss, service interruptions and compliance lapses bring it forward.
Output: Dated reassessments, and findings closed against deadlines
- 10
Plan the exit before you need it
Data returned in a usable format and deleted, access revoked, transition help agreed. For a critical provider, walk through the exit on paper.
Output: An exit plan, then a deletion record and access removed
NIST also ranks the work. SP 800-161 Rev. 1 Update 1 makes criticality and prioritised supplier assessment foundational, puts surveys, site visits, certifications and contract language among its sustaining practices, and leaves automation for "once sustaining practices have been broadly implemented".
How a tier is set
A tier decides how hard you look, so it has to come from the exposure rather than the invoice. Four questions carry it, each with a source. The first is the data the party holds: CPS 234 paragraph 16 scales the assessment of a third party to "the potential consequences of an information security incident affecting those assets", and the ISM's service registers record the data's sensitivity. The second is the access it has into your systems, the same test applied to systems. The third is what stops if it fails: GV.SC-04's criticality, and the US agencies' critical activities, which each organisation identifies for itself. The fourth is how hard the party would be to replace, which DORA Article 29(1) asks before any contract. The figure carries the answers from the worked example.
- Corvane's answers and tier
- The tier model
- What each tier gets
Four questions at intake, with Corvane's answers
What data does it hold?
Corvane Employee records and customer shipment data
What access does it have into your systems?
Corvane Privileged, on every server
What stops if it fails?
Corvane Warehouse dispatch
How hard is it to replace?
Corvane About a year
The tier
Rationale: privileged access to every server, supporting warehouse dispatch.
Tier
Due diligence
Contract
Who accepts
Review
Critical
Questionnaire, independent evidence read in full, the subcontractor list, and how they reach your systems
Full security schedule
The executive who owns the operation
Shortest interval, plus triggers
High
Questionnaire and independent evidence
Security schedule
The CISO
Shorter interval, plus triggers
Medium
Desk research and the evidence on file
Standard security terms
The system owner
Standard interval
Low
Desk research
Standard terms
The system owner
Longest interval
Critical
- Due diligence
- Questionnaire, independent evidence read in full, the subcontractor list, and how they reach your systems
- Contract
- Full security schedule
- Who accepts
- The executive who owns the operation
- Review
- Shortest interval, plus triggers
High
- Due diligence
- Questionnaire and independent evidence
- Contract
- Security schedule
- Who accepts
- The CISO
- Review
- Shorter interval, plus triggers
Medium
- Due diligence
- Desk research and the evidence on file
- Contract
- Standard security terms
- Who accepts
- The system owner
- Review
- Standard interval
Low
- Due diligence
- Desk research
- Contract
- Standard terms
- Who accepts
- The system owner
- Review
- Longest interval
What each tier gets, in Harbourline's policy
The weights and the number of tiers are each organisation's own; none of these regimes prescribes them. Depth follows the tier. At the lowest, desk research and the evidence on file may be enough. At the highest, due diligence reads the independent evidence in full, asks for the subcontractor list and examines how the provider will reach your systems. NIST SP 1326 (July 2026) names five components of due diligence on ICT suppliers: foreign ownership, control or influence; provenance; resilience; foundational cyber practices; and supply chain tiers. For APRA-regulated entities, CPS 234 paragraphs 16, 22 and 28 add the security half: assess the third party's capability, evaluate the design of its controls, and check any control testing you rely on.
How to read a SOC 2 report
Every guide says to collect a SOC 2 report; reading it is the work. The AICPA's description criteria require the system description to disclose any subservice organisation, meaning the provider's own providers, by one of two methods. Under the inclusive method its controls are disclosed and tested. Under the carve-out method only the types of controls assumed there are disclosed, and nothing is tested. The report must also list complementary user entity controls: the controls the provider assumes its customer runs.
So a carved-out subservice organisation is a fourth party the auditor did not test, and a complementary user entity control is one you must run yourself for the report's assurance to hold. Read those, then the scope, the period and the exceptions.
Fourth parties and concentration
A fourth party is "a party a service provider relies on in delivering services to the entity", in CPS 230's definition. NIST asks criticality analysis to reach "fourth- and fifth-party suppliers", and names the case that matters most: "third-party suppliers receiving critical input or services from a common fourth-party supplier". That is concentration through a shared fourth party.
The simpler form is one provider doing several jobs, which the US agencies list as "dependency on a single provider for multiple activities". DORA Article 29 requires a concentration assessment before contracting: whether the provider is easily substitutable, and whether the entity would hold several arrangements with the same or closely connected providers. CPS 230 paragraph 47(c) brings the fourth parties behind material service providers into policy, and the CPS 230 guide covers those paragraphs in full.
- You
- Third and fourth parties
- A shared fourth party
You
Harbourline Logistics
Freight and warehousing, Brisbane
3rd party
Corvane Managed Services
IT operations: service desk, servers, patching and backups
4th party
Remote monitoring and management platform
Corvane's management tool, with an agent on every server
4th party
After-hours service desk, Manila
Corvane's subcontractor, with remote access to customer systems
4th party · shared
One cloud provider, one region
Holds Corvane's backup storage and hosts the warehouse management software
Shared: one outage takes the system and its backups
3rd party
Warehouse management software provider
Runs the dispatch system as a cloud service
4th party · shared
One cloud provider, one region
Holds Corvane's backup storage and hosts the warehouse management software
Shared: one outage takes the system and its backups
3rd party
Telematics provider
Vehicle tracking across the fleet
Subcontractor list not yet requested
The clauses that carry the controls
A finding the provider agrees to fix belongs in the contract, or it stays a promise. The US agencies list sixteen contract topics, from the scope of the arrangement to default and termination. DORA Article 30(2) sets terms for every ICT contract, and Article 30(3) adds more for critical or important functions, including exit strategies with a mandatory transition period. The ISM writes each clause as its own control, and GDPR Article 28 bars a processor from engaging another without the controller's prior written authorisation.
- What the clause gives you
- Who asks for it
- The clause the worked example turned on
Incident notification
You hear about an incident at the provider as soon as possible after it is discovered, and about unauthorised access to your systems immediately, at a contact you named.
Right to audit and verify
You can check the provider's controls yourself, and the ISM expects the right to be exercised regularly.
Subcontractors named, notified and bound
You know who else handles your data, and you hear before that list changes.
Data location
You know which regions hold your data, with notice before that changes.
Security requirements and their review
The security you assessed is written down, and reviewed while the contract runs.
Provider access to your systems
The provider reaches your systems only with the tools, addresses and time windows you approved, and you keep the log.
Exit and the return of data
Your data comes back in a format you can use, the provider deletes its copy, and you get notice before the service stops.
Termination and break clauses
You can leave a provider that fails its security requirements without waiting for the term to run out.
The access row is the newest. ISM-1073 says a provider does not access or administer your systems without a contractual arrangement. ISM-2124, new in September 2026, restricts that access "to remote management tools, source network addresses and time windows explicitly approved by the organisation". ISM-2125, also new, requires it to be "independently logged by the organisation in a manner that the service provider cannot modify or delete". ASD calls these "additional safeguards rather than ... substitutes" for the measures that apply to any privileged user, such as individually attributable accounts and multi-factor authentication.
Deciding, monitoring and exit
The decision is approve, approve with conditions, or reject, and the risk that remains is accepted by a named person at the level the tier demands. The ISM says it plainly for cloud: an organisation "will still need to decide whether a particular outsourced cloud service represents an acceptable security risk". The risk register guide covers the mechanics of an acceptance; none of them change when the risk sits with a supplier.
Monitoring runs on two clocks: the review date the tier sets, and triggers that bring it forward. The US agencies list the triggers: "material or repeat audit findings, deterioration in financial condition, security breaches, data loss, service interruptions, compliance lapses, or other indicators of increased risk". Monitoring "may be conducted on a periodic or continuous basis", more often where the relationship supports higher-risk activities. Several vendor pages make continuous monitoring a stage; the regulator leaves the choice to you.
Exit is planned at the start. GV.SC-10, the agencies' termination stage, DORA Article 28(8) and CPS 230 paragraph 55(d) all ask for it, and the ISM writes the mechanics into the contract: portable data that allows migration "without any loss of data" (ISM-1574) and one month's notice before the service ends (ISM-1575).
A worked example: a logistics company hands its IT operations to a managed service provider
Harbourline Logistics is a freight and warehousing company of 1,800 people, with its head office in Brisbane and eleven distribution centres. It is certified to ISO/IEC 27001:2022, with a surveillance audit due in March 2027. It is not regulated by APRA, which is the point: third-party risk management is not a banking discipline. All names and figures here are fictional.
The intake. On 22 June 2026 the Chief Information Officer, Andrew Kerr, files an intake to hand day-to-day IT operations to Corvane Managed Services from 1 September 2026: the service desk, server and endpoint management, patching and backups, including administration of the warehouse management system. It records the four answers the tier needs. Corvane will handle employee records and customer shipment data, classified Confidential, with privileged access to every server. Warehouse dispatch stops if it fails, and replacing it would take about a year.
The tier. On 24 June the analyst, Lena Vos, tiers Corvane Critical: privileged access to every server, supporting warehouse dispatch. The Chief Information Security Officer (CISO), Nadia Haddad, approves the intake on 25 June, so neither the requester nor the analyst approves their own work.
Due diligence. The questionnaire goes out on 29 June and comes back on 17 July. Corvane's SOC 2 Type 2 report, covering 1 April 2025 to 31 March 2026, and its ISO/IEC 27001 certificate arrive on 3 July. Lena Vos reads the report in five places.
- Read and in order
- An exception
- Now your control
- Not tested, or not there
SOC 2 Type 2 report
Corvane Managed Services
Section 1
Independent service auditor's report
Section 2
Management's assertion
Section 3
Description of the system
Section 4
Controls, tests and results
- 1
ScopeIn order
Managed infrastructure services from the Brisbane and Sydney operations centres. The services Harbourline is buying sit inside it.
- 2
PeriodIn order
Type 2, 1 April 2025 to 31 March 2026: controls tested over twelve months, ending three months before the review.
- 3
ExceptionsBecame F-3
One: administrator accounts of leavers removed late in two of 25 samples. The same access Harbourline is about to grant.
- 4
Complementary user entity controlsNow Harbourline's
The customer reviews the provider accounts with access to its systems each quarter. The report only holds if Harbourline runs this.
- 5
Subservice organisationsBecame F-2 and F-4
The management platform vendor and the backup storage provider are carved out, so not tested. The Manila after-hours desk is not mentioned at all.
Three of the five matter more than the clean opinion. The exception concerns the very access Harbourline is about to grant. The user entity control, a quarterly review of the Corvane accounts that can reach the customer's systems, is now Harbourline's, and nobody runs it yet. The two carve-outs are fourth parties the auditor never tested.
Fourth parties. Lena Vos asks for the subcontractor list on 14 July and receives it on 21 July. It names an after-hours service desk in Manila, with remote access to customer systems, that appears in neither the SOC 2 report nor the proposal. It also shows Corvane's backup storage with the same cloud provider, in the same region, as Harbourline's warehouse management software: one regional outage would take the system and its backups together.
The findings. The assessment closes on 29 July with five.
- F-1 is rated High. One shared administrator account reaches every server through Corvane's management agent, from any address, at any time, and it must close before go-live.
- F-2 is rated High. The Manila desk has remote access and is not under contract, and the fix names it as a subcontractor, states its regions, requires one month's notice of change (ISM-1794, ISM-1572) and puts it inside the audit right.
- F-3 is rated Medium and records the SOC 2 exception. The fix is evidence that the two later quarters were clean, plus Harbourline's own quarterly account review.
- F-4 is rated Medium. Production and backups run through one tool, and the backups share a region with the warehouse system. That is the US agencies' single provider for multiple activities and NIST's common fourth party in one finding.
- F-5 is rated Low, because the proposal has no exit terms. The fix is the return of configuration, credentials and documentation, a data export in a documented format, a deletion record and one month's notice of cessation (ISM-1574, ISM-1575).
Four of the five are about how Corvane reaches Harbourline's systems and what it holds when it does.
- As proposed
- The finding
- As contracted
Accounts · as proposed
One shared administrator account for every Corvane engineer.
Accounts · as contracted
A named account for each engineer, with multi-factor authentication.
Reach · as proposed
The management agent on every server, reachable from any address at any time.
Reach · as contracted
Reachable only from two Corvane address ranges, in change windows Harbourline approves (ISM-2124).
Logs · as proposed
Session logs kept in Corvane's own console.
Logs · as contracted
Every session logged to Harbourline's own log store, which Corvane cannot change or delete (ISM-2125).
Backups · as proposed
Backups run through the same tool, stored in the same cloud region as the warehouse system.
Backups · as contracted
An immutable copy of critical backups in a Harbourline account in another region, outside Corvane's administration.
Unauthorised access · as proposed
Not covered in the proposal.
Unauthorised access · as contracted
Treated as a cyber security incident, with immediate notice to Harbourline (ISM-1576).
The contract. The security schedule is agreed on 12 August, closing F-2 and F-5, and the contract is signed on 21 August 2026. It requires notice of any incident as soon as possible and within 24 hours of discovery, a figure Harbourline set on top of ISM-0141's "as soon as possible". It treats unauthorised access by Corvane as a cyber security incident, notified to Harbourline immediately (ISM-1576), adds an audit right exercised each year (ISM-1571, ISM-1738), names the subcontractors, states where data is held, and carries the access terms, the exit terms and a break clause for failing security requirements (ISM-1804). F-3 closes on 18 August.
The decision. On 19 August the Chief Operating Officer, Rosa Delgado, as business owner of warehouse operations, accepts the residual risk of one provider holding privileged access to production and to the primary backups. Her three conditions: F-1 closed before go-live; Corvane's privileged sessions reviewed weekly until an immutable backup copy is live; and that copy live by 30 September. The acceptance expires on 31 March 2027. The person who owns the operation that stops if Corvane fails is the person who carries the risk.
Into Harbourline's own plans. F-1 closes on 28 August, and Corvane goes live on 1 September 2026. It is on the incident response contact list, and the continuity plan for warehouse dispatch names Corvane as a dependency with the restore path from the immutable copy, which goes live on 30 September and treats F-4. The next full reassessment is 1 March 2027, sooner on a change notice from Corvane, a breach at Corvane or a listed subcontractor, a new SOC 2 report with exceptions, or a change to the services.
Third party · Corvane Managed Services
Active · tier CriticalIT operations from 1 September 2026: service desk, server and endpoint management, patching and backups, including administration of the warehouse management system.
- Tier rationale
- Privileged access to every server, supporting warehouse dispatch. Set 24 June 2026.
Evidence
- SOC 2 Type 2
- 1 April 2025 to 31 March 2026, received 3 July 2026. Read to its exception, its user entity control and its two carve-outs.
- ISO/IEC 27001
- Certificate received 3 July 2026, scope managed infrastructure services.
- Questionnaire
- Issued 29 June, returned 17 July 2026, scored by Lena Vos.
- Subcontractors
- List requested 14 July, received 21 July 2026.
Findings
F-1 · HighClosed 28 Aug
Shared administrator account, reachable from anywhere
Owner Andrew Kerr · due 31 Aug 2026
F-2 · HighClosed 12 Aug
Manila after-hours desk not under contract
Owner Lena Vos · due 21 Aug 2026
F-3 · MediumClosed 18 Aug
SOC 2 exception on leavers' accounts
Owner Lena Vos · due 31 Aug 2026
F-4 · MediumTreated 30 Sep
Production and backups behind one tool and one region
Owner Andrew Kerr · due 30 Sep 2026
F-5 · LowClosed 12 Aug
No exit or transition terms
Owner Lena Vos · due 21 Aug 2026
Contract
- Security schedule
- Agreed 12 August 2026. Contract signed 21 August 2026.
The acceptance
Accepted by Rosa Delgado, Chief Operating Officer and business owner of warehouse operations, on 19 August 2026.
- Risk accepted
- One provider holds privileged access to production and to the primary backups.
Conditions
- 01F-1 closed before go-live.
- 02Corvane's privileged sessions reviewed weekly until the immutable backup copy is live.
- 03The immutable copy live by 30 September 2026.
- Expires
- 31 March 2027.
- Residual rating
- Medium, recorded at the moment of acceptance.
Review and fourth parties
- Next review
- 1 March 2027, earlier on a change notice, a breach, a new report with exceptions or a change of service.
- The third party and its providers
- Evidence and closure
- Findings
- Contract and decision
The audit walk, March 2027. The ISO 27001 auditor walks Annex A 5.19 to 5.23. Control 5.19 gets the policy and the tier, 5.20 the security schedule, 5.21 the subcontractor list and F-2, and 5.22 the review date, the change-notice clause and the weekly session reviews. Control 5.23 covers cloud services Harbourline uses directly, so the warehouse management software's own record answers it. What Harbourline holds is short: one tier with a reason, one SOC 2 report read to its carve-outs, five findings closed against dates, one signed schedule and one acceptance with an owner and an expiry.
Common mistakes
Eight failure modes share one root: the vendor file records that a review happened, and leaves out what it found and who decided. Here is Corvane written both ways.
- A spreadsheet row
- The numbered mistake
- A managed relationship
- Tiering by spend or by the provider's size. A cheap tool with administrator access outranks an expensive supplier that never touches your data. Tier on data, access, what stops and how hard the party is to replace.
- Sending every provider the same long questionnaire and treating the answers as evidence. A questionnaire records what the provider says about itself. Set the depth by tier, and corroborate with independent evidence; NIST lists surveys, on-site visits and certifications together as confidence-building mechanisms.
- Filing "SOC 2: yes". Read the scope, the period, the exceptions, the user entity controls and the carve-outs, and adopt the user entity controls as your own.
- Signing before the review finishes. After signature the provider has no reason to accept new controls. Start at intake, as GV.SC-06 asks, and turn each finding into a clause.
- Stopping at the third party. Ask for the subcontractor list, require notice of any change to it (ISM-1794, and GDPR Article 28(2) for processors), and look for shared providers and for one provider doing several jobs.
- Reviewing once, at signing. Set the next review date from the tier, and write down the triggers that bring it forward.
- Leaving the residual risk accepted by nobody, or by procurement, with no expiry. A named person at the level the tier demands accepts it, with conditions and a date it comes back.
- Having no exit plan. Write the exit terms into the contract, and walk through the exit for a critical provider on paper before you need it.
Third-party risk management compared with its neighbours
Five names cover overlapping work. They differ in what they examine, the product you acquire or the relationship you depend on, and in which risks they count. Security questionnaires and security ratings are tools used inside the program, never a substitute for it.
- Third-party risk management
- Regulator-defined
- Procurement-led
- A NIST framework term
Third-party risk management
The relationship · every risk type
Every outside party you rely on, every risk type, over the whole relationship.
Outsourcing and material service providers
The regulator's version, with registers that go to the regulator: CPS 230, DORA, the EBA guidelines.
Vendor risk management
The same work for the parties you buy from, usually led by security. Same method, smaller boundary.
The product · every risk type
Supplier risk management
Procurement's discipline: a supplier's financial health, delivery, quality, sanctions and ethics.
The product · security risk
Cyber supply chain risk management
NIST's term: the security of the products and services you acquire, down to components and provenance.
| Term | What it is | Reach for it when |
|---|---|---|
| Third-party risk management | Every outside party you rely on, every risk type, over the whole relationship from intake to exit. | You want one program and one register for everyone you depend on, contract or not. |
| Vendor risk management | The same work for the parties you buy from, usually led by security and compliance. | The name fits a smaller organisation better. Nothing in the method changes. |
| Supplier risk management | Procurement's discipline for a supplier's financial health, delivery, quality, sanctions and ethics. | The risk is the supply of goods. Share the inventory with the third-party program so nobody is tracked twice. |
| Cyber supply chain risk management (C-SCRM) | NIST's term, in SP 800-161 Rev. 1 Update 1 and CSF 2.0's GV.SC, for the security of the products and services you acquire, down to components and provenance. | You buy or build technology and need to know what is inside it, such as its components and where they came from. |
| Outsourcing and material service provider management | The prudential form: CPS 230, DORA's critical or important functions and the EBA guidelines, with registers that go to the regulator. | You are regulated and the provider supports a critical operation. The CPS 230 guide covers the Australian version. |
| Security questionnaires and security ratings | Tools inside the program. A questionnaire collects the provider's own answers; a rating scores its internet-facing posture from outside. | You need inputs to due diligence. Neither one is the decision. |
| Business continuity dependency mapping | Which business processes depend on which providers, and what happens to each process when one fails. | The question is what stops, rather than how secure the provider is. |
| Risk register | The record of the risks an organisation has identified, what it decided about each, and who decided. | A third-party risk remains after treatment and needs an owner, a decision and a date it comes back. |
Standards and references
Most of what is published on this subject is out of date. The EBA's 2019 outsourcing guidelines, OCC Bulletin 2013-29 and the CPS 230 that commenced in July 2025 have each been replaced, and the edition of NIST SP 800-161 to cite is Rev. 1 Update 1.
- Regulators and government
- Voluntary standards
- What it replaced
- December 2025 to September 2026
Jul 2019
APRA CPS 234 in force
Information security, including information assets managed by third parties.
2021 to 2023
ISO/IEC 27036 parts 1 to 3
Supplier relationships: concepts, requirements, and supply chain security for hardware, software and services.
Oct 2022
ISO/IEC 27001:2022
Annex A 5.19 to 5.23 on supplier relationships, with 5.23 on cloud services.
Dec 2022
DORA adopted
Articles 28 to 30 on ICT third-party risk. Applies from 17 January 2025.
Jun 2023
US interagency guidance
Five lifecycle stages and sixteen contract topics for US banks.
Replaced OCC Bulletins 2013-29 and 2020-10, the Federal Reserve's 2013 and the FDIC's 2008 guidance
Feb 2024
NIST CSF 2.0
Supply chain risk management becomes a Govern category, GV.SC.
Nov 2024
DORA register templates
Implementing Regulation (EU) 2024/2956 fixes the register of information.
Nov 2024
NIST SP 800-161 Rev. 1 Update 1
References moved to CSF 2.0.
Replaced The May 2022 text, as the edition to cite
Nov 2025
First critical ICT providers designated
The ESAs bring them under direct EU oversight.
The last ten months
Dec 2025
Basel principles
A common baseline for banks and supervisors.
Replaced The Joint Forum's 2005 Outsourcing in financial services, for banks
Jul 2026
APRA CPS 230, re-made
Commenced 1 July 2026. Service providers at paragraphs 46 to 61.
Replaced The CPS 230 that commenced on 1 July 2025
Jul 2026
NIST SP 1326
A due diligence quick-start guide for ICT suppliers.
Sep 2026
EBA third-party guidelines
Full lifecycle, aligned with DORA, two-year transition.
Replaced The 2019 Guidelines on outsourcing arrangements
Sep 2026
ASD ISM, September 2026
ISM-2124 and ISM-2125 on how a service provider reaches your systems.
US interagency guidance (Federal Reserve, FDIC and OCC, June 2023). Published at 88 FR 37920 on 9 June 2023. Section IV.C holds the five stages, the contract topics (a) to (p) and the monitoring triggers. It replaced the agencies' earlier guidance, including OCC Bulletins 2013-29 and 2020-10.
DORA, Regulation (EU) 2022/2554 (December 2022, applying from 17 January 2025). Articles 28 to 30, with the register templates in Implementing Regulation (EU) 2024/2956 of 29 November 2024; the first critical ICT third-party providers were designated on 18 November 2025. EUR-Lex refused automated reads, so the wording quoted here came from a text mirror and should be checked against EUR-Lex.
EBA Guidelines on the management of third-party risk (18 September 2026). They replace the 2019 outsourcing guidelines, cover the full lifecycle, align with DORA and carry a two-year transition, applying once published in all EU languages. Cited from the EBA's press release.
Basel Committee, Principles for the sound management of third-party risk (10 December 2025). A common baseline for banks and supervisors, superseding the 2005 Joint Forum paper Outsourcing in financial services for banks. Cited from the release, since the full text refused automated download.
NIST CSF 2.0 (February 2024), SP 800-161 Rev. 1 Update 1 (1 November 2024) and SP 1326 (July 2026). GV.SC, ID.AM-04 and ID.RA-10; the three tiers of practice and Appendix C on criticality; the due diligence components, read from the abstract only.
ISO/IEC 27036 and ISO/IEC 27001:2022 Annex A 5.19 to 5.23. ISO/IEC 27036 covers supplier relationships in four parts, including Part 3:2023 on hardware, software and services supply chain security; Part 2:2022 sets requirements but is not intended for certification. Annex A 5.19 to 5.23 are the supplier controls an auditor reads. ISO sells its standards, so these summaries come from dated secondary sources; check them against a licensed copy.
APRA CPS 230 (1 July 2026) and CPS 234 (1 July 2019). CPS 234 paragraphs 16, 22, 28 and 34 apply to every information asset a third party manages. The CPS 230 guide explains the service provider paragraphs.
ASD Information security manual, September 2026. The guidelines for procurement and outsourcing, including the service registers and ISM-2124 and ISM-2125. The ISM becomes an obligation through the Protective Security Policy Framework, a contract, a state policy or a direction.
GDPR Article 28, NIS2 Article 21(2)(d), and SOC 2 criterion CC9.2. The SOC 2 wording and the description criteria come from auditor explainers, chiefly Linford & Co (February 2021); check them against the AICPA's text.
How Alvor helps
With Alvor, an organisation can run third-party risk as the lifecycle this guide describes, with the separation of duties and the dates enforced by the product.
Every relationship starts as an intake filed before the vendor is engaged. The requester records why the vendor is needed, the services, a contact and a plain profile of data, access and dependence. Someone other than the requester triages and approves it, and the person who accepts the residual risk cannot be the analyst who assessed the vendor. Triage picks desk research, a vendor questionnaire, or both. Intake opens the vendor record at an intake stage; approval opens the first due diligence assessment and moves the vendor into due diligence in one step.
The tier is derived from the intake profile (the data the vendor will hold, its access, how critical the service is and how hard it would be to replace), with a one-line rationale an analyst can override. The tier sets how often the vendor is reassessed, and when a review date passes the next assessment is already waiting in draft.
The vendor answers one structured questionnaire, weighted across risk domains, in a hardened external portal with a rotating link, an emailed code, autosave and evidence upload, and needs no Alvor account. Every submission writes to the hash-chained audit log, and an analyst override keeps the vendor's original answer beside it.
The vendor record holds contacts, contracts, certifications, the scored assessment and its findings. Certifications and contracts are tracked for expiry, and each contract records its incident-notification window in hours and whether its protective clauses are present: right to audit, notice of subcontracting, return and destruction of data, data location, termination rights and the rest. Sub-processors are recorded with their country and grouped across vendors, so a provider behind several Critical or High vendors shows up as a concentration. Findings carry severity deadlines, and a daily sweep flags breaches of them.
Residual risk is accepted only by the person named to accept it, typed Business Owner, System Owner or CISO, with conditions, a scope and an expiry; the residual score is snapshotted at the decision, and the expiry is enforced on schedule. Offboarding runs as a checklist: revoke access, get the data back, obtain the destruction certificate, terminate the contract, confirm the sub-processors are informed, and repoint the dependent business processes. The register and findings export to CSV.
In Business Continuity, a business process declares the vendors it depends on, each with its own criticality, so the plan for warehouse dispatch would know it relies on Corvane. The AI Assistant is bring-your-own-model: it reads vendors, findings and assessments, answers questions such as which vendors support a Tier 1 process, and proposes any finding or status change as an approval card a person accepts. No model approves a vendor or accepts a risk.
Alvor Advisory runs a Third-Party Risk Assessment, which inventories and tiers the vendor estate by the access and data each vendor holds, and a Managed Third-Party Risk engagement that runs the program as a standing service.
Alvor runs as a dedicated single-tenant instance in the region you choose, on your own servers, or air-gapped. Third-Party Risk Management covers the module in full.